My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS AND WORK PLANS 1992-1999
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0009002
>
FIELD DOCUMENTS AND WORK PLANS 1992-1999
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 9:57:43 PM
Creation date
2/22/2019 2:55:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
FileName_PostFix
AND WORK PLANS 1992-1999
RECORD_ID
PR0009002
PE
2960
FACILITY_ID
FA0004040
FACILITY_NAME
SPX COOLING TECHNOLOGIES INC
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> THE MARLEY COOLING TOWER COMPANY OCT 1 9 1992 <br /> 5800 Foxridge Drive/P.O. Box 2912/Mission, Kansas 66201/Telephone: (913) 362-1818 ENVIRONMENTAL HEALTH <br /> PERMIT/SERVICES <br /> October 13 , 1992 <br /> gr . Duncan Austin <br /> epartm*Aft of Toxic Substances Controf <br /> A cou ting Unit. <br /> P. 806 <br /> Sacramento , California 95812-0806 <br /> RE: Progress Report For August and September , 1992 <br /> Dear Mr . Austin: <br /> The following is a report for the activities refated to the <br /> Stockton site for August and September, 1992 , <br /> A,, Groundwater Monitoring <br /> The report for the July sampling is due to be <br /> released the week of October 19 , 1992 . The next <br /> monitoring is scheduled for the week of November 2 , <br /> 1992 . Marley has proposed that this be limited to <br /> water elevations . The report would discuss <br /> directions of flow and estimated capture zones . A <br /> full sampling and report would be done in January , <br /> 1993 . The Water Board is reviewing the proposal . <br /> B. Remedial Action <br /> 1 . Subsurface Soils <br /> The Flushing System is operational with <br /> additional neutron probe , water elevations and <br /> pump test scheduled for the Oct . -Nov . time- <br /> frame . <br /> 2 . Groundwater <br /> MARLEY <br /> the <br /> COOLING TOWER <br /> company <br />
The URL can be used to link to this page
Your browser does not support the video tag.