Laserfiche WebLink
a. <br /> Improvements and adjustments to the Water <br /> Treating Plant continue to be made . The results <br /> of these improvements can be seen in the <br /> increased output of the plant . ( 11 . 5 million <br /> gals . in August vs . 4 . 8 million gals . in July ) . <br /> C. NPDES Permit <br /> The draft is being reviewed and rewritten. <br /> Sincerely, <br /> THE MARLEY COOLING TOWER CO. <br /> David W, Bates <br /> Chief Production Engineer <br /> DB/jel <br /> cc' s : William Ryan- DTSC / Val Siebal-DTSC <br /> Ronald Valinoti-SJEHD✓ Cori Condon-CRWQCB <br /> Jeff Zelikson-USEPA Tim Verhagen-TMC <br /> Howard Rinne-Stockton Tom Hickey-Black & Veatch <br /> File <br />