My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WAGNER
>
200
>
2900 - Site Mitigation Program
>
PR0541087
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2020 3:36:03 PM
Creation date
2/22/2019 3:33:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0541087
PE
2959
FACILITY_ID
FA0023524
FACILITY_NAME
SPX MARLEY COOLING FACILITY
STREET_NUMBER
200
Direction
N
STREET_NAME
WAGNER
STREET_TYPE
AVE
City
STOCKTON
Zip
95215
APN
14331007
CURRENT_STATUS
01
SITE_LOCATION
200 N WAGNER AVE
P_LOCATION
01
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. Well Completion Report <br /> Information on the design,construction, and development of each well will be compiled <br /> and presented in a well completion report to be submitted to DTSC,Central Valley <br /> Regional Water Quality Control Board(RWQCB), and the San Joaquin County <br /> Environmental Health Department. The report will include: 1) a boring log that <br /> documents the drilling activities, and 2) an as-built well construction diagram and well <br /> construction log. The well construction log and well construction diagram will include <br /> the following information: <br /> • Well Identifier; <br /> • Date and time of construction; <br /> • Borehole diameter and well casing diameter; <br /> • Total depth of borehole and well casing (±0.1 ft); <br /> • Well casing material,joint type and length; <br /> • Well screen slot size and interval; <br /> • Filter pack material, gradation, uniformity coefficient and size; <br /> • Filter pack volume (calculated and actual); <br /> • Filter pack placement method; <br /> • Annular seal composition and placement method; <br /> • Annular seal volume (calculated and actual); <br /> • Surface seal composition and placement method; <br /> • Surface seal volume(calculated and actual); <br /> • Surface seal and well apron design/construction; <br /> • Well development procedure and turbidity measured at end of development; <br /> • Ground surface elevation (±0.01 ft); <br /> • Survey reference point elevation (±0.01 ft) on well casing. <br /> The well completion report will be reviewed, signed and stamped by a California <br /> certified professional geologist. The report will be finalized and submitted to DTSC, <br /> RWQCB, and the San Joaquin County Environmental Health Department within 60 days <br /> of the completion of the well construction and survey. <br /> Work Plan—Installation of Monitor Wells 9672 <br /> SPX Corporation 6 Dudek <br /> Stockton,California May 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.