My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000562
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
139
>
3500 - Local Oversight Program
>
PR0544169
>
ARCHIVED REPORTS XR0000562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2019 10:53:45 PM
Creation date
2/22/2019 3:53:45 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0000562
RECORD_ID
PR0544169
PE
3528
FACILITY_ID
FA0006437
FACILITY_NAME
CHEVRON STATION #90557*** (INACT)
STREET_NUMBER
139
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
APN
13730012
CURRENT_STATUS
02
SITE_LOCATION
139 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' FIELD SERVICES REQUEST <br /> ITE INFORMATION FORM <br />' Identification Project Type Check Appropriate Category <br /> Project#: 77CH.90557.00.0350 �X Operation & Maintenance ❑X Budget Site Visit <br />' Station ID #: CHEVRON 90557 Sampling Out of Budget Site Visit <br /> Site Address: 139 SOUTH CENTER ST. 1 st Time Visit <br /> STOCKTON, CA D Quarterly — — Budget Hours: 4 <br /> Lab: Lancaster Labs 1st 2nd 3rd 4th Actual Hours: <br /> County: SANJOAOUIN Monthly Mob/de Mob: 2 <br /> Project Manager: William E. Brasher Semi-Monthly <br /> Requester: Bob Jackson Weekly Site Safety Concerns <br /> Client: Chevron ElOne Time Event <br /> Client P.O.C: Bob Cochran E] Other: Start-up/Feasibility Testing <br /> Date of Request: 9/16/02 Field Date: Starting 3/28/2002 <br />' Field Tasks Genera[ DescriMion <br /> 1) Conduct site O&M, record parameters as per the"Ozone sparge system field monitoring data sheets"to include <br />' monitoring points MP-1 through MP-5. <br /> 2) Bring appropriate traffic control and wear safety vest at all times. <br /> 3) Ensure that the ozone sparge system is up and running prior to leaving site and that compound is secure. <br /> 10) Repair air pump and replace anti vibration dampners/annotate new air pump serial number on unit.,"o,'4 'r, N4 \ <br /> 5) Calibrate Ozone meter and annotate ambient air readings on field data sheets, record well integrity. J <br />' 6) Return Ozone meter and field data sheets to Bob Jackson. <br /> 7) Contact site engineer prior to leaving site <br /> 8) Ensure that all well heads in the ozone sparge monitoring network have well head bolts installed <br /> 9) Complete an LPO(�- � TID s 7"4'1-r- ( I r-raN'rH) <br /> 10)Take ferrous Iron readings from MW-1, MW-10, MW-2, MW-111,MW-9, MW-9a, MW-9s <br /> r[O-r- GY-1vk Sri 04T-focT vEZ1':7',6 7a,�-rt�iry� SrS7�n�5 M- L ,rr-Cy oza,I ' <br /> Ic ) '74+r4 ozcYv4= n IZ� P-ems_ SGS <br /> Comments/ Remarks from Field Staff <br /> r ►;� lft <br />' W-0 <br /> fill <br /> 9s <br />' Completed By: Date: SECOR <br /> Fntamationat incorporated <br />
The URL can be used to link to this page
Your browser does not support the video tag.