Laserfiche WebLink
OZONE SPARGE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br />' Date:_ [.Q� _ Time of Arrival: <br /> Technician:Damon Minarich _ Time of Departure: —A I> <br /> Site Engineer:_ David Evans _ Time Site Engineer was contacted: <br /> PART A: GENERAL INFORMATION <br /> Site Location: Chevron 9-0557, 139 South Center Street, Stockton, CA Project No. 77CH.90557.00.0350 <br /> KVA C-Sparger Panel: 120V/16 A 1.6 sparge point system Elect. Meter Reading: <br /> Electrical Power: 1 phase <br /> Hourmeter Reading: Q At Time— {��'e( I <br /> i <br />' PART B: Ozone Sparge System <br /> System up or down upon arrival: 4)l•yyj <br />' Pressure Delivered to Sparge Point(PSI) <br /> Sparge Point Pressure(PSI) <br />' OS-1S �J <br /> OS-ID <br />' OS-2S 97 <br /> OS-2D <br /> i <br /> OS-3D 3 <br /> OS-4D 3S <br /> Cycle Timer(Min) <br /> Sparge Point Cycle Timer(min) <br /> 0S-'S <br /> OS-1 D 1 f <br /> OS-2S �L -......-. <br /> OS-2D <br /> OS-3D <br /> OS-4D j}i <br />