Laserfiche WebLink
new seawall to stabilize the channel bottom adjacent to the seawall If rock rip-rap is used,the project <br /> study area would extend up to an additional 30 feet into the channel(Sheet 4,Appendix A) <br /> The south bank of Weber Point within the study area was used as a wharf in the 1870's,prior to ' <br /> construction of the existing seawall Weber Point has now been completely disturbed and was the site of a <br /> i� Holiday Inn hotel that has since been demolished Most of Weber Point was paved with concrete and <br /> !I asphalt,which is now partially covered with dirt Ruderal,weedy vegetation grows in these disturbed ' <br /> �P areas A chain link fence encloses much of the abandoned area formerly occupied by the hotel The south <br /> side of the ARCO station along the seawall is landscaped with introduced,horticultural tree species <br /> 1II� <br /> D. Required Permits and Approvals <br /> �r I <br /> • U S Army Corps of Engineers Nationwide 13 and 25 Permits,and Section 10 Letter of Permission ' <br /> • Department of Fish and Game 1601 Streambed Alteration Agreement <br /> �� • Regional Water Quality Control Board 401 Water Quality Certification' <br /> ' •' U S Fish and Wildlife Service Informal Consultation ! ' <br /> 'i` • Cultu ml Heritage Board Certificate of Appropriateness <br /> 1� • City of Stockton Building and Grading Permits <br /> E. Relationship of this Expanded initial Study to other Studies <br /> and Plans I 1 <br /> Copies of the following documents are available for review at the City of Stockton Community <br /> Development Department, 345 North El Dorado Street,Stockton,CA 9520211 1 <br /> - <br /> Biological and Fisheries Resources Evaluation and Wetland Delineation Report 17 July 1997 Prepared <br /> J by Sycamore Environmental Consultants, Inc,under contract with Siegfried Engineering,Inc,for the <br /> 1 City of Stockton ' <br /> Draft and Final EIR for Amended West End Urban Renewal Project No l,i 1991 Prepared for the City of <br /> Stockton by Paoli and Associates <br /> aExpanded Initial Study for Record Expansion Project August 1996 File Number IS 24-96 Prepared for <br /> City of Stockton by Harry W Montgomery <br /> Findings,Statement of Overriding Considerations and Mitigation and Monitoring Program For Amended <br /> West End Urban Renewal Project No 1, State Clearinghouse Number 900021082 City of Stockton ' <br /> I�4 <br /> Limited Phase 1I Assessment, 1997 Weber Point South Seawall,221 Center Street(Portion of), Stockton, <br /> !� (APN 139-090-08) Report prepared by Klemfelder for Siegfried Engineering ' <br /> I <br /> Limited Phase II,Addendum No 1, 1997 Weber Point South Seawall,221 Center Street(Portion of), <br /> Stockton,(APN 139-090-08) Report prepared by Kleinfelder for Siegfried Engineering <br /> Preliminary Environmental Site Assessment, Weber Point South Seawall,221 Center Street(Portion of), ' <br /> Stockton,(APN 139-090-08) 1997 Report prepared by Kleinfelder'for Siegfried Engineering <br /> Structural Engineering Investigation for the Stockton Channel Seawall Siegfried Engineering,Inc <br /> I Pre ared for the City of Stockton by Siegfried Engineering, Inc <br /> p I 1 <br /> Weber Point/Banner Island Master Development Plan, Expanded Initial Study October 1996 File <br /> Number IS 29-96 Prepared for City of Stockton by RMI <br /> 4 <br /> I <br /> r <br /> I <br /> I I <br /> i <br /> I <br /> EX-IS-04 DOC 912597 2 <br />