Laserfiche WebLink
in KLEINFELDER <br /> 8 LIMITATIONS <br /> r <br /> Phase I environmental assessments are non-comprehensive by nature and are unlikely to Identify <br /> all environmental problems or eliminate all risk The attached report is a qualitative assessment <br /> Kleinfelder offers a range of Investigative and engineering services to suit the needs of our <br /> clients, Including more quantitative Investigations Although risk can never be eliminated, more <br /> detailed and extensive investigations yield more information, which may help you understand <br /> and better manage your risks Since such detailed services Involve greater expense, we ask our <br /> clients to participate in identifying the level of service which will provide them with an <br /> acceptable level of risk Please contact the signatories of this report if you would like to discuss <br /> this Issue of risk further <br /> rThe scope of work on this project was presented in our proposal (20-1129-30) dated November <br /> 18, 1996 and subsequently approved by you as our client Please be aware our scope of work <br /> rwas limited to those items specifically identified in the proposal Environmental issues not <br /> specifically addressed in the proposal of this report were beyond the scope of our work and not <br /> ' Included in our evaluation <br /> Kleinfelder performed this environmental assessment in accordance with the guidelines set forth <br /> in the American Society for Testing and Materials (ASTM) Standard Practice for Environmental <br /> Site Assessments Phase I Environmental Site Assessment Process (Designation E-1527-94) No <br /> warranty, either expressed or implied, is made <br /> rLand use, site conditions (both on-site and off-site) and other factors will change over time <br /> Since site activities and regulations beyond our control could change at any time after the <br /> completion of this ieport, our observations, findings and opinions can be considered valid only as <br /> of the date of the site visit This report should not be relied upon after 180 days from the date of <br /> it issuance (ASTM Standard E-1527, Section 4 6) <br /> The property owner is solely responsible for notifying all governmental agencies, and the public <br /> at large, of the existence, release, treatment or disposal of any hazardous materials observed at <br /> the project site, either before or during performance of Kleinfelder's services Kleinfelder <br /> assumes no responsibility or liability whatsoever for any claim, loss of property value, damage, <br /> ' or injury which results from pre-existing hazardous materials being encountered or present on the <br /> project site, or from the discovery of such hazardous materials <br /> Any party other than the client who would like to use this report shall notify Kleinfelder of such <br /> intended use b\ executing the Application for Authorization to Use" contained in this <br /> document Based on the intended use of the report, Kleinfelder may require that additional work <br /> be performed and that an updated report been issued Non-compliance with any of these <br /> requirements by the client of anyone else will release Kleinfelder from any liability resulting <br /> from the use of this repoit by any tinauthotized party <br /> 211-1129-301201711241 Page 15 of 16 <br /> © 1997 Kleinfd&r Ing July 14, 1997 <br />