Laserfiche WebLink
KLEINFELDER <br /> ' 6 RESULTS <br /> 1 <br /> ' 6.1. GROUNDWATER FLOW DIRECTION AND GRADIENT <br /> Water levels measurements were made in each of the monitoring wells during drilling, <br /> ' development, and prior to sampling. The depths to water levels during the groundwater sampling <br /> event were converted to elevations in reference to the survey conducted. The tops of each <br /> monitoring well were chosen as the water level and survey measuring points. <br /> The groundwater flow direction was calculated to be towards the east/southeast. The groundwater <br /> ' gradient was calculated to be 0.003 feet/foot. See Plate 3 for a groundwater contour map. <br /> ' 6.2. MONITORING WELL SOIL BORING SAMPLING RESULTS <br /> Soil samples were collected from three borings advanced for the installation of monitoring wells <br /> ' on the site. A total of six soil samples were submitted for laboratory analysis. The soil samples <br /> were analyzed CAM-17 metals, Volatile Organics, TPH-d, TPH-mo, TPH-g. The following table <br /> ' details the results. <br /> 1 <br /> ' 42162.E01 /ST0411854 <br /> Copyright 2004,Kleinfelder,Inc. Page 14 <br /> of 22 <br /> 2004 <br /> 1July <br />