My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
317
>
2900 - Site Mitigation Program
>
PR0516724
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 3:06:21 PM
Creation date
2/25/2019 1:19:24 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516724
PE
2950
FACILITY_ID
FA0012756
FACILITY_NAME
ELKS LODGE PROPERTY
STREET_NUMBER
317
Direction
S
STREET_NAME
CENTER
City
STOCKTON
Zip
95202
APN
13731010
CURRENT_STATUS
01
SITE_LOCATION
317 S CENTER
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WHF, Inc., Environment Engineering Group • <br /> Health & Safety Plan <br /> Page: 3 <br /> A defined project site layout is paramount to the safe completion of all remedial site <br /> ' investigations. The project site layout has built-in safety features. The site is divided into <br /> three zones. The following list defines the required personnel protective equipment. <br /> ' 2.1 Personnel Protective Equipment (PPE) <br /> Personnel who will be working in or around the exclusion zone of the job site will use <br /> the following protective equipment and measures as warrant by the Project Manager: <br /> • Coveralls as an undergarment <br /> ' • Saranex outer garment <br /> • Sample gloves (inner) <br /> • PVC, Nitrile or Neoprene outer gloves <br /> • Hard hat <br /> • Steel toe boots <br /> • Robars or Tingley boots <br /> • Full face piece respirator with R53HE cartridges (a combination of organic <br /> vapor, acid gas, pesticide, radionuclide, high efficiency filter). Note that <br /> ' cartridges should be changed daily. <br /> • All joints to be taped <br /> ' • Self-contained air will be utilized if project dictates <br /> More stringent protective equipment requirements will be implemented if necessary. <br /> This determination will be made by the project supervisor after review of the materials <br /> to be handled, the ambient monitoring data, consultation with on-site technical <br /> personnel, the Safety Officer, and the proper management personnel. Upgrades in PPE, <br /> iif necessary, will be implemented. <br /> ' 2.2 General Safety <br /> The on-site Safety Officer will be responsible for the following daily safety <br /> ' implementations: <br /> 2.3 Daily Safety Meetings <br /> Each day prior to commencing work, a safety meeting shall be held to discuss safety <br /> considerations for the day's work to be done. A safety topic shall be addressed each <br /> day from the following list: <br /> 0 Site Safety Plan (first day and once a week thereafter) <br />
The URL can be used to link to this page
Your browser does not support the video tag.