My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:49:12 PM
Creation date
2/25/2019 1:40:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
` James L. Tjosvold, P.E. <br /> October 23, 1998 <br /> Page 3 <br /> this quarterly monitoring will be submitted to DTSC and the RWQCB by the end of <br /> October, 1998. <br /> III. Schedule Changes: <br /> A draft schedule for the design and construction of the soil remedial measure was <br /> submitted to DTSC on June 9, 1998. This schedule was also presented during an October <br /> 8, 1998 meeting with DTSC on the remedial design. <br /> The draft schedule calls for the draft RDIP to be submitted to DTSC at the end of October, <br /> 1998, and for approval of the final RDIP by the end of December, 1998. Construction of <br /> the soil remedial measure is expected to begin in April, 1999. <br /> IV. Activities Planned for Next Quarter: <br /> On October 8, 1998, PG&E met with DTSC to go over the draft RDIP. At this meeting, <br /> the contents of the RDIP,the draft soil remedial design drawings, the proposed soil <br /> management plan,the proposed soil verification sampling plan,the proposed groundwater <br /> monitoring program and the draft schedule were discussed. In addition PG&E and DTSC <br /> discussed whether the RAP needs to be amended because of recent regulatory changes <br /> which affect management of tar pit residue and discussed what concentration of <br /> polynuclear aromatic hydrocarbons is acceptable in soils to be used as backfill. <br /> V. Results of Analyses. Tests or Other Data: <br /> Groundwater sampling was conducted in June, 1998 and in September, 1998. The <br /> analytical results for the June, 1998 sampling were submitted to DTSC and the RWQCB <br /> on July 31, 1998 in the Quarterly Monitoring Report, PG&E Stockton Former MGP Site, <br /> Second Quarter, 1998. The results of the September, 1998 sampling will be submitted to <br /> DTSC and the RWQCB by the end of October, 1998. <br /> If you have any questions or require additional information, please call me at(415) <br /> 973-6254. <br /> Sincerely, <br /> Patricia Sullivan <br /> Project Manager- Stockton Former Manufactured Gas Plant Site <br />
The URL can be used to link to this page
Your browser does not support the video tag.