My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 4:49:12 PM
Creation date
2/25/2019 1:40:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
James L. Tjosvold, P.E. <br /> May 11, 1998 <br /> Page 3 <br /> III. Schedule Changes: <br /> The schedule was last revised and sent to DTSC for approval on March 10, 1997. <br /> However, in a conference call on December 8, 1997, changes to the schedule were made <br /> which shifted the public comment period and the public meeting to after the Christmas <br /> holidays. On March 27, 1998, DTSC and PG&E discussed a draft schedule regarding the <br /> next steps for the project, with the goal of constructing the remedial measure in Spring, <br /> 1999. PG&E will be submitting a schedule for this next phase of the project to DTSC. <br /> IV. Activities Planned for Next Ouarter: <br /> The final RAP and Negative Declaration for the project were approved by DTSC in a letter <br /> dated April 2, 1998. A complete final RAP (which included the approved Negative <br /> Declaration) was issued by PG&E on April 9, 1998. <br /> With the final RAP now approved and complete, PG&E will begin the Remedial Design <br /> and Implementation Plan for the project(currently scheduled to be submitted to DTSC in <br /> October, 1998). <br /> The next quarterly groundwater monitoring will be conducted in June, 1998. The results of <br /> this quarterly monitoring will be submitted to DTSC and the RWQCB by the end of July <br /> 1998. <br /> V. Results of Analyses, Tests or Other Data: <br /> Groundwater sampling was conducted in December, 1997, and the analytical results were <br /> submitted to DTSC and the RWQCB on January 30, 1998 in the Quarterly Monitoring <br /> Report, PG&E Stockton Former MGP Site, Fourth Quarter, 1997. <br /> If you have any questions or require additional information,please call me at(415) <br /> 973-6254. <br /> Sincerely, <br /> �C,udi <br /> Patricia Sullivan <br /> Project Manager- Stockton Former Manufactured Gas Plant Site <br />
The URL can be used to link to this page
Your browser does not support the video tag.