My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0506832
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 8:05:30 PM
Creation date
2/25/2019 1:46:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0506832
PE
2950
FACILITY_ID
FA0007654
FACILITY_NAME
PG&E - GAS LOAD CENTER
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 • <br /> 8.0 CONTINGENCY PLAN <br /> 8.1 General <br /> Each subcontractor will be required to provide all the equipment necessary to meet safe <br /> operating practices and procedures for its personnel onsite and be responsible for the <br /> safety of its workers. All general safety guidelines and procedures will conform to: <br /> • 20 CFR 1910.120 <br /> • Standard Operating Safety Guides (USEPA, November 1984) <br /> The general safe work practices are described below: <br /> • Eating, drinking, chewing gum or tobacco, and smoking will not be allowed at <br /> designated work areas; <br /> • Wash facilities will be utilized by workers in the work areas before eating, <br /> drinking, or use of the toilet facilities; <br /> • Containers will be labeled identifying their contents; <br /> • Personnel at the Site will use the "buddy system" when wearing any <br /> respiratory protective equipment. No one will be allowed to engage in drilling <br /> and sampling operations alone; <br /> • No facial hair which interferes with a satisfactory fit of the mask to face seal <br /> will be allowed (no beards, large mustaches, or long sideburns); <br /> • All respirator protection selection, use, and maintenance will meet the <br /> requirements of established procedures, recognized consensus standards <br /> (AIHA, ANSI, MSHA, and NIOSH), and will comply in all respects to the <br /> requirements set forth in 20 CFR 1910.134; <br /> • All Site personnel will be required to wear hard hats, protective glasses and <br /> adequate hand protection when in the work zone; <br /> • Artificial Site illumination will be used if field activities need to be performed <br /> after daylight hours. <br /> • If needed, onsite generators, located outdoors in designated areas shall be <br /> used to supply power for electric tools and I or lighting. The electrical cords <br /> will be encased in appropriate jackets to prevent tearing and will be laid down <br /> in a pathway away from equipment or other onsite activities. The lighting <br /> shall be provided with approved explosion-proof elements and will be <br /> strategically stationed away from the areas of activities, yet provide adequate <br /> lighting. Prior to use and periodically, all cables and lights shall be inspected <br /> to assure safe and continuous operation. <br /> • All personnel will abide by the OSHA requirements set forth by 29 CFR 1910, <br /> ENV~ 21 February 2005 <br /> A M E R I C A P:\PG&E\PGE-05-01 Stockton MW26R Investigation\MW26 Work Plan\H&S\H&S Plan-2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.