My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> DRAFT <br /> activities. To determine if the TPH-gasoline and diesel in the groundwater is from soils on PG&E property and <br /> whether solvents are present, the following field activities will be implemented: <br /> • Three borings(SB96-6, -7,and-8)will be drilled on site within the footprint of the former auto <br /> repair facility and upgradient of MW-2311 to Zone A groundwater(approximately 35 feet) <br /> • A fourth boring(SB96-9)will be drilled offsite,upgradient from Area 11 (Figure 2). <br /> • Grab groundwater samples from Zone A will be collected from one on-site boring and the offsite, <br /> upgradient boring using HydropunchTM or equivalent groundwater sampling techniques <br /> • The soil and groundwater at this site will be analyzed for COCs <br /> It is anticipated that approximately 7 samples per boring will be collected for analysis. Sample collection will <br /> be every 5 feet to the bottom of the vadose zone. Additional samples may be collected if residues are observed <br /> in the field. <br /> If COCs are not detected in soil, the source of the TPH-diesel in groundwater will be assumed to be upgradient <br /> of the PG&E property. <br /> Establish Downgradient Extent of COCs in Zone B Groundwater <br /> One additional groundwater monitoring well(MW-26)is proposed along the eastern perimeter of Area II. <br /> The Phase IV investigation indicated the presence of PNAs in Zone B groundwater beneath Area II. In order <br /> to define the extent of PNAs in Zone B groundwater the following field work will be performed: <br /> • One boring will be drilled along the eastern perimeter of Area II <br /> • Grab groundwater samples will be collected from the boring in both Zone A and Zone B <br /> • If PNAs are detected in the Zone B sample, the monitoring well will be relocated to the alternate <br /> location across E 1 Dorado. <br /> • The boring will be converted to a perimeter monitoring well <br /> • The monitoring well will be developed <br /> • The monitoring well will be sampled <br /> The proposed well will be installed along the perimeter of the site. The proposed location and alternate <br /> location of this well are shown in Figure 2. Due to overhead and underground obstructions as well as <br /> limitations presented by the City of Stockton(the City),these locations also represent physical limits to future <br /> drilling. The City will not permit drilling in the streets or within 10 feet of the toe of the Mormon Slough levee <br /> and overhead obstructions and underground obstructions also preclude drilling at these locations. <br /> Field Methodology <br /> Soil borings will be drilled using direct push drilling techniques described in the Supplemental Soil <br /> Investigation Workplan (June 1995). Soil from the soil borings will be collected continuously to the water <br /> table. Samples will be selected every 5 feet for laboratory analysis. In addition,grab groundwater samples from <br /> the Area II borings will be collected from one on-site boring and the offsite,upgradient boring(SB-96-5) using <br /> Hydropunch1m or equivalent groundwater sampling techniques. Descriptions of the groundwater sampling <br /> technique are provided in Workplan Phase IV Groundwater Investigation(February 1996). <br /> SF0/GAAV1 I.DOC 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.