My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 1995-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
SITE INFORMATION AND CORRESPONDENCE 1995-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:15:28 PM
Creation date
2/25/2019 2:39:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
1995-2004
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
355
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. FS objectives and goals <br /> 2. Agency roles <br /> 3. Data gaps (general) <br /> Let's examine the variations that may take place with regards to proceeding with the <br /> FS versus collecting any more data <br /> DRIVERS: <br /> What is your understanding of the drivers involved? <br /> • Desired outcome/risks <br /> • Schedule <br /> • PG&E budget(general) <br /> Response: <br /> Fran, Fernando, Bob and Philip: Desire good quality information to be able to <br /> make decisions. <br /> Money will be better spent with good planning and fewer <br /> iterations. <br /> DTSC needs to see progress. <br /> Schedule measures progress for DTSC management. <br /> Tricia Sullivan: Allow time in the schedule for meetings. <br /> Variation 1 vs 2 <br /> Variation 1 proposed proceeding with the FS followed by collecting data based on <br /> the recommended alternative. Variation 2 proposed agreement on specific data needs <br /> followed by data collection and the FS. <br /> Fran Anderson: Would like to see a combination of Variations 1 and 2 where <br /> data collection and proceding with the feasibility study take <br /> place at the same time. <br /> Also look at biodegradation of PNAs. <br /> Philip Isorena: Mentioned the VISIT model; we need to see if Jeff Morrison <br /> has access to it. Philip Isorena has it. <br /> Action Items (as outlined by Fran Anderson): <br /> 1. VLEACH working session first/Source Area Definition/Define Area I data <br /> gaps <br />
The URL can be used to link to this page
Your browser does not support the video tag.