Laserfiche WebLink
2. Collect Area I soil data gaps, Area II diesel characterization, and DI Wet test <br /> 3. Proceed w/FS(Soil and groundwater) <br /> 4. Meetings: Technologies, ARABS <br /> Screening of alternatives <br /> Detailed alternatives evaluation -- recommendation <br /> 4. During FS drill in Zone B on El Dorado to look at downgradient extent <br /> 6.0 Future technical agreements and progress <br /> This topic was discussed a little throughout the meeting, in the context of a group <br /> desire to have progress and more trust among group members. <br /> 7.0 Wrap up/Action items <br /> Near term action items: <br /> 1. Submit the Draft Soil FS responses to comments and project schedule <br /> Submit week of 8/12 <br /> 2. VLEACH meeting/Source Areas <br /> Possible dates: 822, 828, 9/6 <br /> 3. Submit Schedule <br /> 4. Technology/ARARS meeting <br /> Possible dates: 9/12, 9/18, 920 <br /> S. Proceed with FS as described in above action items descriptions. <br /> 8 <br />