Laserfiche WebLink
James L. Tjosvold, P.E. <br /> January 25, 1996 <br /> Page 4 <br /> V. Results of Analyses. Tests or Other Data: <br /> Groundwater sampling was conducted in December, 1995 and the analytical results will be <br /> submitted to DTSC and the RWQCB by January 31, 1996 in the"Quarterly Monitoring <br /> Report, PG&E Stockton Former MGP Site, Fourth Quarter, 1995". <br /> PG&E received a letter from the RWQCB dated November 20, 1995 suggesting that <br /> MW-13 be sampled on a quarterly basis. On December 1, 1995, PG&E agreed that <br /> starting with the fourth quarter monitoring event, MW-13 would be sampled on a <br /> quarterly basis. <br /> If you have any questions or require additional information, please call me at (415) 973- <br /> 6254. <br /> Sincerely, <br /> Patricia Sullivan <br /> Project Manager Stockton Manufactured Gas Plant Site <br /> cc: Mr. William H. Crooks, Executive Officer <br /> Attention: Ms. Wendy Cohen <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, CA 95827-3098 <br /> Mr. Ron Valinoti, Director <br /> Attention: Ms. Linda Turkatte <br /> San Joaquin Local Health District <br /> P.O. Box 2009 <br /> Stockton, CA 95202 <br />