Laserfiche WebLink
• <br /> James L. Tjosvold, P.E. <br /> January 25, 1996 <br /> Page 3 <br /> preliminary results of fate and transport modeling which is being done to evaluate PNAs <br /> and BTEX in the non-source areas. <br /> The third quarter monitoring report was submitted to DTSC and the RWQCB on October <br /> 31, 1995. The collection of monthly groundwater elevation measurements continued <br /> through December, 1995. The fourth quarter monitoring event was conducted December <br /> 4 and 5, 1995. The results of this fourth quarter monitoring event will be presented in the <br /> fourth quarter monitoring report which will be submitted to DTSC and the RWQCB by <br /> January 31, 1996. <br /> III. Schedule Changes: <br /> An updated project schedule which incorporates performing a treatability study prior to <br /> the final Soil OUFS will be submitted to DTSC. <br /> IV. Activities Planned for Next Quarter: <br /> The final Soil OUFS is scheduled to be delivered to DTSC and the RWQCB in June, <br /> 1996. This final Soil OUFS will incorporate the criteria used to define the soil source <br /> areas, the results of fate and transport modeling done on PNAs and BTEX in the non- <br /> source soils, the results of the treatability study, and DTSC's and RWQCB's comments on <br /> the draft Soil OUFS. Revised sections of the Soil OUFS which discuss the criteria used to <br /> define the source areas and the results of fate and transport modeling being done on PNAs <br /> and BTEX in the soil will be submitted to DTSC and the RWQCB for their review prior <br /> to submittal of the final Soil OUFS. The results of the treatability study done to evaluate <br /> the effectiveness of the proposed soil remedial action will be available in early May, 1996 <br /> and will be discussed with the agencies at that time. <br /> The draft Phase IV groundwater investigation work plan to install six additional <br /> groundwater monitoring wells at the site was delivered to DTSC and the RWQCB on <br /> January 8, 1996. A conference call to discuss this draft work plan took place on January <br /> 22, 1996 and the work plan will be finalized in February, 1996. Phase IV work to install <br /> the monitoring wells is scheduled to begin in April, 1996. <br /> "The Quarterly Monitoring Report, PG&E Stockton Former MGP Site, Fourth Quarter, <br /> 1995", will be submitted to DTSC and the RWQCB by January 31, 1996. <br /> The next quarterly groundwater monitoring will be conducted in March, 1996. <br />