My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2900 - Site Mitigation Program
>
PR0524492
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2019 6:18:36 PM
Creation date
2/25/2019 2:44:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0524492
PE
2959
FACILITY_ID
FA0016428
FACILITY_NAME
PACIFIC GAS & ELECTRIC
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13732002
CURRENT_STATUS
01
SITE_LOCATION
535 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 r <br /> Subpart P, and Title 8 CCR, 1541 will be followed. <br /> For trenches or excavations less than 4 feet in depth: <br /> Whenever possible, workers will not enter trenches or test pit excavations. When <br /> entry is required, standby personnel will be present to respond in the event of an <br /> emergency. <br /> • Stop logs or other barriers will be used to prevent vehicles from rolling into open <br /> trenches or excavation pits. <br /> • Sources of vibration and heavy objects or equipment will not be situated on the <br /> edge of a test pit unless steps are taken to ensure the stability of the trench wall. <br /> • Water will not be allowed to accumulate in trenches and excavations. <br /> • Excavated materials will be stored at least 2 feet from the edge of the trench or <br /> excavation. <br /> 3.1.3 Backhoe and Drilling Specific Hazards and Procedures <br /> Overhead Power Lines <br /> With drill rigs or any other equipment with a high boom, clearance from high voltage lines must <br /> be maintained in accordance to 8 CCR 2946 (Table 2). The minimum required clearance is as <br /> follows: <br /> Nominal Voltage Minimum Required <br /> (Phase to Phase) Clearance (feet) <br /> 600 to 50,000 10 <br /> over 50,000 to 75,000 11 <br /> over 75,000 to 125,000 13 <br /> over 125,000 to 175,000 15 <br /> over 175,000 to 250,000 17 <br /> over 250,000 to 370,000 21 <br /> over 370,000 to 550,000 27 <br /> over 550,000 to 1 ,000,000 42 <br /> The Site personnel shall be aware of increased electrical hazards during high humidity or rainy <br /> conditions. If the high voltage lines are not tagged, or if the voltage cannot be verified by an <br /> appropriate authority, then a minimum clearance of 42 feet shall be maintained. <br /> In the event the drill rig contacts an overhead power line: do not touch the rig or any person in <br /> contact with the current, keep others away, and call 911 and the local power company. No one <br /> should attempt a rescue unless he/she has proper qualifications. <br /> ENV~ 5 February 2005 <br /> A M E R 1 C A P1PG&E\PGE-05-01 Stockton MW26R Investigation\MW26 Work Plan\H&S\H&S Plan-2005.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.