Laserfiche WebLink
EU <br /> RL..J�! Y <br /> SWRCB,January 2002 SEP 17 2015 Page of__ <br /> 4. TANK ANNULAR TESTING TAI. <br /> Test Method Developed By: D Tank Manufacturer CI Industry Standard NGAl ineer <br /> D Other(Specify) <br /> Test Method Used: 9 Pressure D Vacuum D Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Vacuum pump/gauge Equipment Resolution: 0. 50"Hg <br /> Tank# 87Syphon Tank#87Master TankA87Slave Tank# 91 <br /> Is Tank Exempt From Testing?' D Yes fel No D Yes R]No D Yes )U No D Yes N No <br /> Tank Capacity: 9,490 9, 490 9 ,490 9, 490 <br /> Tank Material: FRP FRP FRP FRP <br /> Tank Manufacturer: Xerxes Xerxes Xerxes Xerxes <br /> Product Stored: Unleaded Unleaded Unleaded Premium <br /> Wait time between applying <br /> pressure/vacuum/water and 1 0 m i n 1 0 m i n 1 0 m i n ' O rr i n <br /> starting test: <br /> Test Start Time: 9 : 55am 10 :15am 10: 35am 11 :OOam <br /> Initial Reading(RI): 1 0-Hg 1 0"Hg 1 0"Hg 1 0"Hg <br /> Test End Time: 10: 55am 11 : 15am 11 : 35am 12:00pm <br /> Final Reading(RF): 1 0"Hg 1 0"Hg 1 0"Hg 1 0"Hg <br /> Test Duration: 1 hr 1 hr 1 hr 1 hr <br /> Change in Reading(RF-RI): 0 .0"Hg 0 .0"Hg 0.011Hg 0.0"Hg <br /> Pass/Fail Threshold or Criteria: ±0. 0"Hg ±0.0"Hg ±0.0"Hg ±9 .0"Hg <br /> Test Result: 501Yes <br /> Pass D Fail 9 Pass D Fail JO Pass Q Fail R Pass D Fail <br /> Was sensor removed for testing? <br /> &No D NA Q Yes �No DNA Q Yes jd No DNA D Yes t No DNA <br /> Was sensor properly replaced and NYes D No DNA Yes ❑No DNA MYes 11 No 11 NA �LlNo <br /> verified functional after testing? <br /> Comments (include information on repairs mode prior to testing and recommended follow-up for failed tests) <br /> Secondary containment systems where the cofitinuous monitoring automatically monitors both the primary and secondary <br /> containment,such as systems that are hydrostatically monitored or under constant vacuum,are exempt from periodic containment <br /> testing. {California Code of Regulations,Title 23,Section 2637(a)(6)) <br />