My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:59:08 PM
Creation date
2/26/2019 11:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III <br /> RECEIVEL <br /> 5tP 17 2015 <br /> SWRCB,January 2002 P,a a of <br /> 5. SECONDARY PIPE TESTINGENVIRONMENTAg <br /> Test Method Developed By: 9 Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: 0 Pressure ❑Vacuum ❑Hydrostatic <br /> ❑Other'(Specify) <br /> Test Equipment Used:Nitrogen/pressure gauge E4uipmentResolution: 0.50psi <br /> Piping Run#87Syp PipingRun#87Mas Piping Run#87S1a Piping Run# 91 <br /> Piping Material: FRP FRP FRP FRP <br /> Piping Manufacturer: AO Smith AO Smith AO Smith AO Smith <br /> Piping Diameter: 211_311 . _ 211_3" 211_3" 211_3" <br /> Length of Piping Run: 18, 140' 1 2' 140 ' <br /> Product Stored: Unleaded Unleaded Unleaded Premium <br /> Method and location of Test boot Test boot Test boot Test boot <br /> piping-run isolation: -nside stp sum Inside stp sum inside stp su inside stp sum <br /> Wait time between applying <br /> pressure/vacuum/water and 1 0 m i n 1 0 m i n 1 0 m i n 1 0 m i n <br /> starting test: <br /> Test Start Time: 10: 20am 10: 10am 11 :05am 11 :20am <br /> Initial Reading(R,): 5psi 5psi 5psi 5psi <br /> Test End Time: 1 1 : 2 0 am 1 1 : 1 0 am 1 2:0 5 pm 1 2:2 0 pm <br /> Final Reading(RF): 5psi 5psi 5psi 5psi <br /> Test Duration: 1 h r 1 h r 1 h r 1 h r <br /> Change in Reading(RF-R;): 0.0 p s i 0 .0 p s i 0. O p s i 0.0 p s i <br /> Pass/Fail Threshold or ±O.Opsi ±O.Opsi ±O.Opsi ±C .Opsi <br /> Criteria: <br /> Test Result: 3 Pass .0 Fail 2 Pass 0 Fail �R Pass ❑Fail )C Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.