My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2010 - 2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2010 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2019 1:59:08 PM
Creation date
2/26/2019 11:59:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 - 2015
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 17 2015 <br /> S WRCB,January 2002 E NVI RO N M ENT of <br /> 7. UNDER-DISPENSER CONTAINMENT UDC TEST IT'nCOAOTIACAIT <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> U Other(Specify,) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> U Other(Specify) <br /> Test Equipment Used: INCON TS—STS Equipment Resolution: 0 .0001 " <br /> UDC# 1 /2 UDC# 3/4 UDC# 5/6 UDC# 7 8 <br /> UDC Manufacturer: Environ Environ Environ Environ <br /> UDC Material: FRP FRP FRP FRP <br /> UDC 2911 2911 2911 2911 <br /> Height from UDC Bottom to Top 1 011 1 0" 1011 1 0" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to 611 611 61' 611 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Clean Clean Clean Clean <br /> testing: <br /> Portion of UDC Tested 1211 1211 1211 1211 <br /> Does turbine shut down when N Yes ❑No U NA <br /> UDC sensor detects liquid(both t Yes U No ❑NA XYes U No O NA )1 Yes 1_No O NA <br /> product and water)?* <br /> Turbine shutdown response time 5 s e c 6 s e c 5 s e e 4 s e c <br /> Is system programmed for fail- K Yes O No 0 NA <br /> L <br /> safe shutdown?* Yes ❑No ❑NA 1111Yes No NA Yes 11No ❑NA <br /> Was fail-safe verified to be %Yes O No [INA [XYes O No DNA 3Yes ❑No O NA X1 Yes O No O NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum../water and 1 0 m i n 1 0 m i n l O m i n l O m i n <br /> starting test <br /> Test Start Time: 9 : 5 0 am 9 : 5 0 am 9 : 31 am 9 :31 am <br /> Initial Reading (R1): 3. 3265' 2 . 5561 " 2.9386" 4. 2236" <br /> Test End Time: 10 :05am 10 :05am 9: 46am 9: 46am <br /> Final Reading RF : 3 . 3258" 2 .5561 " 2 .9397" 4 .2239" <br /> Test Duration: 15min 15min 15min 15min <br /> Chane in Reading RF-&): 0. 0007" 0 .0 0 0 0" 0 . 000911 0 0003" <br /> Pass/Fail Threshold or Criteria: ±0.0 0 2" ±0.002" ±0.002" ±O .002" <br /> Test Result: X Pass U Fait N Pass O Fail K1 Pass O Fail 81 Pass O Fail <br /> Was sensor removed for testing? N Yes O No [INA Xl Yes ONO O NA 01 Yes n No O NA %Yes U No ❑NA <br /> Was sensor properly replaced and X Yes O No n NA IP Yes ']No [INA &3 Yes U No CNA ZYes ❑No U NA <br /> verified functional after testing? <br /> Comments—(include information on repairs made prior to testing,and recommended follow-up forfailed tests) <br /> If the entire depth of the UDC is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC inust be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.