My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
25775
>
2300 - Underground Storage Tank Program
>
PR0231708
>
COMPLIANCE INFO 2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2023 2:13:59 PM
Creation date
2/26/2019 12:07:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231708
PE
2361
FACILITY_ID
FA0003619
FACILITY_NAME
ARP MINI MART CORP
STREET_NUMBER
25775
Direction
S
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376
APN
20910004
CURRENT_STATUS
01
SITE_LOCATION
25775 S PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
506
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Don Mukai - 2 - January23, 2013 <br />Bravo, since dimensions of the new dispenser and the existing UDC determine the size <br />and angle of the sloped weirs. <br />Review Process of the CONY -132000 <br />Pursuant to California Code of Regulations (CCR), Title 23, § 2636(g)(3), we have <br />reviewed the application to determine whether the system adequately protects the soil <br />and beneficial uses of groundwater. During the review process the State Water Board <br />received and reviewed the following documents: Dispenser Conversion Frame, Model <br />CONV-B2000 product literature; State Registered Professional Engineer Approval letter; <br />Conversion Frame Specifications; and Bravo Conversion Frame Installation/lnspection <br />Manual. A California registered Professional Engineer has reviewed the Bravo catalog <br />sheet with specifications and the 82000 Conversion Frame Installation Instructions and <br />has concluded that the frame is acceptable for adapting an existing installed UDC to a <br />new dispenser (See Enclosure 2). <br />Conditions of Approval for the CONY -132000 <br />Based on the Professional Engineer's review and the documentation you've submitted, <br />we are granting approval of the CONV-132000 under the following conditions: <br />1. This model comes in several sizes in order to accommodate various dimensions <br />of UDC and dispenser. Schematics of all existing and future sizes for the CONV- <br />B2000 shall be made available upon request of the State Water Board. <br />2. Materials and procedures employed in the construction of the CONV-132000 shall <br />remain the same as the materials that were indicated in the documents reviewed <br />by the State Water Board. <br />3. Installation procedures in no way supersede local, State, and federal regulations. <br />Qualified individuals must obey all local laws, regulations, and requirements <br />when installing the CONV-132000. <br />4. The procedures (CONV-B2000 Conversion Frame fnstallation/Inspection Manual <br />dated August 21, 2012) submitted in the approval process must be followed in <br />their entirety. Any variations in the installation procedures must be reviewed and <br />approved by the State Water Board. <br />5. Only qualified individuals meeting the requirements of CCR, Title 23, section <br />2715(h), including training and certification by the manufacturer (S. Bravo <br />Systems, Inc.), are allowed to install this product. <br />6. Final authority to approve the use of the CONY -132000 in a particular jurisdiction <br />rests with the local regulatory agency. The local agency may require <br />preapproval, permit, and/or inspection of the installation by either local agency <br />staff or a registered professional engineer (special inspector) who has education <br />and experience with* underground storage tank system installations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.