My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1201
>
3500 - Local Oversight Program
>
PR0544188
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 12:17:43 PM
Creation date
2/27/2019 9:40:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544188
PE
3526
FACILITY_ID
FA0006698
FACILITY_NAME
FERNANDOS PLACE
STREET_NUMBER
1201
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95209
APN
14716003
CURRENT_STATUS
02
SITE_LOCATION
1201 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11 January 2007 <br /> AGE-NC Project No. 00-0769 <br /> Page 4 of 8 <br /> 2.4, INSTALLATION OF GROUND WATER TREATMENT SYSTEM <br /> AGE anticipates that initiation of the proposed shallow and deep ground water extraction, treatment <br /> and disposal system utilizing granular activated carbon vessels will retard the off-site migration of <br /> dissolved petroleum hydrocarbons and fuel additive 1 ,2-DCA and reduce the overall hydrocarbon <br /> mass prior to full-scale mitigation. <br /> 2.4. 1 . Well Pumps, Installation and Process Piping <br /> It is anticipated that a Grundfos Rediflow down-well pump, type 5E5, equipped with a Franklin <br /> /z-hp, 230V, 3-wire motor will be installed in the newly installed ground water extraction wells. <br /> One-inch diameter Schedule 40 PVC piping will be installed from the pump discharge to the surface <br /> with a safety chain to prevent dropping the pump to the well bottom. This pump is rated to remove <br /> five-gallons of water per minute. To minimize sediment intake through the pump, the bottom of the <br /> pump/motor assembly will be suspended approximately 2 feet from the extraction well bottom. <br /> Electrical wiring will be connected from the top of the pump through Class I electrical <br /> connectors/junction boxes and electrical conduit to the pump controller. <br /> 2.4.2. Well and Process Pump Controllers <br /> Both the extraction well pumps will be controlled by a PumpTec controller; the well pumps will <br /> operate on an independent controller. The pump will be controlled by an amperage sensing/time <br /> control switch. This switch will detect a decrease of amperage when water level drops below the <br /> impeller intake from the Grundfos pump. <br /> The process pump, located "downstream" of the holding tank, will be controlled by electrode <br /> switches placed at various levels in the holding tank. An emergency shut-off switch will be located <br /> immediately below the top of the holding tank. An intermediate pump-on switch will be placed <br /> approximately 8 inches below the emergency shut-off switch and activate the process pump. <br /> Intermediate pump-off switches will be utilized near the bottom of the holding tank to turn the <br /> process pump off. <br /> 2.4.3 Treatment System <br /> One 300-gallon poly tank will be used to temporarily store extracted water prior to processing, As <br /> indicated above, this tank will be equipped with various level control switches to control the rate at <br /> which extracted water is introduced into the treatment vessels, to provide safety shutoff capabilities <br /> Adimnced GeoEnvironmental, Inc. <br /> Er <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.