Laserfiche WebLink
i <br /> , <br /> ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> The chain-of-custody record will contain the follo g information: <br /> ✓ site name <br /> ✓ signature of collector <br /> ✓ date and time of collection <br /> ✓ sample identification number(s) <br /> ✓ number of containers in samples t <br /> ✓ description of sample and container(s) <br /> ✓ name and signature of persons, arid the companies or agencies they represent, <br /> who are involved in the chain of possession <br /> ✓ inclusive dates and times of pass Sion. <br /> ✓ requested analysis for each sample <br /> i <br /> 5.3 Delivery of Samples to Laboratory <br /> Samples will be delivered to the laboratory on a daily basis. Samples will be refrigerated to i <br /> approximately 4'C for shipping, Shipping containers will be sealed with security tape to assure <br /> sample integrity during shipping. Delivered samples will be accompanied by a chain-of-custody i <br /> record. The laboratory shall: note on the chain-of-custody that samples were properly <br /> preserved and security tape was:intact upon arriv . <br /> 1 <br /> 6.0 SAMPLING AND DRILLING EQUIPMENT DECONTAMINATION <br /> All equipment used for drilling and sampling will be deco tamiunated prior to use. All equipment used <br /> for collection of more than one sample, such as bailers and spoons, will be decontaminated between <br /> each use to prevent cross contamination between samples. Drilling equipment will be decontaminated <br /> prior to commencing drilling at each hole. Well construction materials will be cleaned as necessary, <br /> prior to installation. <br /> W:\AdminShe1ls\QAQC-98.D0C <br />