My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1425
>
3500 - Local Oversight Program
>
PR0544189
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 10:58:39 AM
Creation date
2/27/2019 10:04:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544189
PE
3528
FACILITY_ID
FA0005107
FACILITY_NAME
SUSD-EDISON HIGH SCHOOL
STREET_NUMBER
1425
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16502008
CURRENT_STATUS
02
SITE_LOCATION
1425 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATC Associates Inc. <br /> Quality Assurance/Quality Control Plan <br /> Revised March 1998 <br /> Equipment and well material decontamination will be conducted on an impermeable surface and all <br /> decontamination effluent will be contained. All sur1kces of the equipment will be thoroughly <br /> decontaminated using a steam cleaner. The equipment v ill be placed on a drying rack for air drying. <br /> The decontamination water will be stored in containers certified for hazardous materials storage and <br /> F <br /> disposed of in an approved manner. <br /> Sample equipment to be used for pesticides and organiC analysis will be washed in a nonphosphate <br /> detergent (Alconox or equivalent) and rinsed with tap water, followed by deionized water. If the <br /> equipment is for metals analysis, the initial rinse will be conducted with 0.1 N nitric acid followed by <br /> tap water and deionized water. ' <br /> 7.0 FIELD EQUIPMENT CALIBRATION AND MAINTENANCE <br /> The following measuring equipment may be used during the Remedial Investigation. Equipment is <br /> grouped by field activity. Calibration procedures and frequency are listed by piece. <br /> Soil Borings and Well Dimensions <br /> Well Dimensions <br /> Steel and coated cloth tape. Calibration: none. <br /> Water Level Measurements in Wells <br /> Steel surveyors tape. Calibration: manufacturersupplied temperature correction will be applied <br /> as applicable for field conditions. Electrical wel sounders. Calibration: check against steel <br /> surveyors tape. <br /> r <br /> W:1Admin13he11s1QAQC-98.DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.