Laserfiche WebLink
3 Page 2 of 2 <br /> has been uploaded into GeoTracker. This Addendum-addresses the second phase <br /> of the investigation, which pertains to the installation of three monitoring wells <br /> based on the soil and groundwater investigation performed in.November 2007. <br /> Per your previous request, a hard copy of the document will not follow. <br /> As aside note, you will notice that John Carrow has signed/stamped the work plan <br /> Addendum as the CAPG, instead of Tom Neely of ETIC. John Carrow (former PSC <br /> to PSC and since John °c P. geologist with the <br /> registered employee) has returnedr . ., g <br /> state of California, <br /> PSC corporate management has decided to utilize John in this <br /> capacity. Therefore, ETIC will be transitioning their role as CAPG to PSC. ETIC <br /> will still be supporting PSC with regard to field support and other minor roles. <br /> Please feel free to call with any questions. <br /> Thank you. <br /> Paul Anderson <br /> PSC-QA.Director <br /> 210 West Sand Bank Road <br /> Columbia,IL 62236 - <br /> Office: (618)281-1543 <br /> Cell: (618)406-0823 <br /> Fax.: (618)281-7020 <br /> panclerson(i2)pscNow�.com <br /> E <br /> I <br /> I <br /> 1 <br /> I <br /> r <br /> F <br /> M <br /> 2/21/2008 <br />