My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
1717
>
3500 - Local Oversight Program
>
PR0544190
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 2:19:24 PM
Creation date
2/27/2019 10:47:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544190
PE
3528
FACILITY_ID
FA0004950
FACILITY_NAME
CENTER STREET PARTS
STREET_NUMBER
1717
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16507228
CURRENT_STATUS
02
SITE_LOCATION
1717 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
398
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 4 <br /> Mike Infurna [EH] <br /> From:: Mike Infurna [EH] <br /> Sent: Monday, February 25, 2008 8:48 AM <br /> To: 'Anderson,,Paul' <br /> Subject: RE: GeoTracker Upload Notification (RI WP.Addendum) - Case#2371, Sara Lee 1717 S. Center <br /> St., Stockton <br /> encroachment is a one time written extortion (oops)fee to gain access to their right of way. <br /> Revocables are designed to remain on file with a $$$bond (typically$1500.)to provide for repairs/removal of the <br /> well head if for some reason you folks/the RP does not remove/repair the well head/box. It's happened before on <br /> very old sites where the contractor took out the revocable and didn't remain with the RP til closure. <br /> If you/the RP doesn't repair or remove the well to their satisfaction, the City cashes the bond and does the work to <br /> return their property to 'before' status...I'm under the impression the bond is returnable if the City'sees no need to <br /> f <br /> cash it. <br /> E when it comes time to take the well out, ANOTHER City encroachment permit will be needed, as well.as another <br /> EHD permit...ours is only$60 for you D sites. <br /> you should know, the City requires FULL CONCRETE SIDEWALK PANEL replacement for wells IN City <br /> sidewalks after the well comes out. You should.plan on the $$$to have the concrete sidewalk COMPLETELY <br /> replaced from expansion joint to expansion joint-THis is sometimes 12-15 long and last I heard expensive. I think <br /> they even designate which contractor can do the concrete work (Jerry Joy Construction) <br /> For wells in the blacktop, it's my understanding a larger full depth asphalt patch is required also. Last one I saw <br /> was -3'X 3' by 8 deep, and has to be a rolled hot mix. <br /> you should check with Reid Campbell (209)937-8349 to verify the destruction/patch requirements and if you must <br /> use THEIR contractor <br /> something here rings of"don't fight City hall"..... <br /> From: Anderson, Paul [mailto:PAnderson@pscnow.com] <br /> Sent: Monday, February 25, 2008 8:30 AM <br /> To: Mike Infurna [EH] <br /> Subject: RE: GeoTracker Upload Notification (RI WP Addendum) - Case # 2371, Sara Lee 1717 S. Center <br /> St., Stockton <br /> Mike, <br /> j Since ETIC has performed this task'for me in the past, I do not understand the difference <br /> between the Encroachment permit and the. Revocable permit. <br /> The Encroachment is $331 and the Revocable is $1,596. <br /> Can you explain the difference between the two and why.the Revocable is needed this <br /> time? <br /> I Thank you.. <br /> Paul Anderson <br /> 2/26/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.