Laserfiche WebLink
� Page 1 of 1 <br /> - I <br /> Mike Infurna [EH1 <br /> From: Anderson, Paul [PAnderson@pscnow.com] <br /> Sent: Friday, February 08, 2008 4:27 PM <br /> To: Mike Infurna [EH] <br /> Cc: Jander, Scott <br /> Subject: GeoTracker Upload Notification (Rl WP Addendum) - Case#2371, Sara Lee 1717 S. Center St.. <br /> Stockton <br /> r <br /> Mike, <br /> This email serves as notification that the-Remedial Investigation Work Plan -Addendum <br /> (February 8, 2008) for the Sara Lee-Center Street site (Case # 2371) has been uploaded into. <br /> GeoTracker. This Addendum addresses the second phase of the investigation, which pertains <br /> to the installation of three monitoring wells based o.n the soil and groundwater investigation <br /> performed in November 2007. <br /> Per your previous. request, a hard copy-of the document will not follow. <br /> As a side note, you will notice that John Carrow has signed/stamped the,work plan Addendum <br /> as the CAPG, instead of Tom Neely of ETIC. John. Carrow (former PSC employee) has <br /> returned to PSC and since John is a registered geologist with the state of California, PSC <br /> corporate management has decided to utilize John in this capacity. Therefore,. ETIC will be <br /> transitioning their role as CAPG to PSC. ETIC will still be supporting PSC with regard to field <br /> support and other minor roles. <br /> Please feel free to call with any questions. <br /> Thank you. <br /> Paul Anderson <br /> PSC-QA Director <br /> 210 West Sand Bank.Road <br /> Columbia_IL 62236 <br /> Office: (618)281-1543 <br /> Cell: (618)406-0823 <br /> Fax: (618)281-7020 <br /> Pa7derson(a?nscNow.con <br /> k <br /> I <br /> I <br /> 2/21/2008 <br />