Laserfiche WebLink
Earthgrains (former) page 2 <br /> 1717 S. Center St., Stockton. <br /> Quarterly remediation reports may be included in the quarterly groundwater <br /> monitoring reports due at EHD prior to subsequent groundwater sampling events. <br /> Please contact Michael Infurna with 48 working-hour notice of these events. <br /> All monitoring well groundwater samples and a representative number of soil vapor <br /> samples should be additionally analyzed for 1,2-DCA, EDB, (8260B) organic lead <br /> (LUFT) and methanol and ethanol (8015m). At least two consecutive groundwater- <br /> sampling events are required for these constituents from all of the four monitoring <br /> wells, sparge well "SP-1", and any groundwater in "VEW-1". Soil vapor analyses for <br /> these constituents may be discontinued if your constant determines they are no <br /> longer needed to support any future conclusions about this site. <br /> If the oxygenate and other gasoline additive constituents are not detected above <br /> acceptable detection levels for two consecutive sampling events, the analysis for the <br /> non-detectable contaminant may be discontinued upon request and EHD approval. <br /> In order to proceed with a Corrective Action, the California Underground Storage <br /> Tank Regulations require EHD to inform the public of the proposed activities <br /> contained in the plan and allow a time period for any comments. <br /> Please have your consultant submit a single paged, non-technical "Executive <br /> Summary" to EHD that explains in general language, a brief history of the site, what <br /> is proposed at the site under the remedial action plan, how the site will be after the <br /> corrective action plan is completed, and the length of time the action will take. EHD <br /> will 'post' the site and establish a comment period for the public to inquire about the <br /> plan. At the end of public comment period, EHD will advise you if you may proceed <br /> with the remedial action or if a hearing has been requested. No corrective action, <br /> including construction, trenching, or system installation may proceed until <br /> EHD notifies you that you have successfully passed the public participation <br /> comment period. <br /> You may contact Michael Infurna at (209) 468-3454 if you have any questions or <br /> wish to discuss the site. Mr. Infurna may also be reached by email at <br /> m i nfu rna(a)s i ce h d.com. <br /> Donna Heran, REHS, Director <br /> Enviro mental HeQalt Diw io <br /> ichael J. Infurna Jr., S nior REHSMarga`1r�� r2t La9orio v <br /> LOP / Site Mitigation Unit IV Supervisor Unit IV <br /> MI/ <br /> c: CVRWQCB—James Barton, Sacramento. <br /> c: Philip Services— Mark Milward, PO Box 230, Columbia, Illinois, 62236. <br /> c: SWRCB-CUF — Mark Owens, Sacramento. <br />