Laserfiche WebLink
i f <br /> Earthgrains (former) page 3 <br /> 1717 S. Center St., Stockton. <br /> The CAP, including the Feasibility Study, is due within one year from this <br /> correspondence. Please familiarize yourself with the minimum reporting items <br /> ' comprehensive nsive re ort. <br /> included in this P <br /> that are to be inclu P <br /> I The CAP should incorporate the findings from the field-testing and include a <br /> proposal for the location, number, and construction specifications of the wells <br /> needed to complete the remedial task. Specific technical data for all equipment <br /> I needed, costs, and an estimate of the time requirement should be included in the <br /> CAP. <br /> i You may contact Michael Infurna at (209) 468-3454 if you have any questions or <br /> wish to discuss the site. Mr. Infurna may also be reached by email at <br /> minfurnw( sicehd.com. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> 21 <br /> Michael J. Infur Jr., enior REHS Nuel C. Henderson, Jr. R.G. <br /> t LOP / Site Mitigation Unit IV LOP / Site Mitigation Unit IV <br /> MI/ <br /> c: CVRWQCB — Marty Hartzell, Sacramento. <br /> c: Philip Services— Mark Milward, PO Box 230, Columbia, Illinois, 62236. <br /> c: SWRCB-CUF — Mark Owens, Sacramento. <br /> i <br />