Laserfiche WebLink
The air spargmg and soil venting pilot test was performed in January 2003 <br /> The pilot test results were submitted in the March 6, 2003 Remedial Action <br />' Plan The findings indicate that this approach would be effective in <br /> remediating impacted soil and groundwater SJCEHD approved the Remedial <br /> Action Plan in correspondence dated March 25, 2003 <br /> Under an approved San Joaquin Valley Air Pollution Control District <br /> (SJVAPCD) permit, PSC installed a soil vapor extraction (SVE) system and <br />' began continuous operation on November 18, 2003 <br /> During system operation, airflow rates are measured in sparging well SP-1 <br />' and in venting wells VW-1 and MW-2 weekly The combined venting rates <br /> prior to the addition of dilution air for VW-1 and MW-2 have ranged from <br /> 2148 cubic feet per minute (cfm) to 90 05 cfin, as of December 16, 2004 In <br /> addition, three vapor samples are collected from the influent stream prior to <br /> the addition of dilution air (designated Influent), the air stream after treatment <br /> by the first carbon vessel (designated GAC-1), and from the discharge from <br />' the second and final carbon vessel (designated GAC-2) The samples are then <br /> submitted to an analytical laboratory for BTEX and TPH-G analyses Results <br /> are reported to the SJVAPCD <br /> A quarterly groundwater-monitoring event was performed in January 2004 <br /> The event data indicated that the groundwater elevation was approximately <br /> 1 7 feet lower than the previous event performed in April 2003 During this <br /> event, the average depth to groundwater was 29 16 feet below ground surface <br /> (bgs) {-19 39 feet mean sea level (msl)} All referred bgs measurements are <br /> taken from the top of well casing The groundwater flow was easterly at a <br /> gradient of approximately 0 005 foot per linear foot Petroleum hydrocarbons <br /> were detected in well MW-2, but concentrations were significantly lower than <br /> rin previous events There were no detectable BTEX or TPH-G concentrations <br /> measured in the samples collected from the remaining wells MW-1, MW-3, or <br /> MW-4 Oxygenate analytes were not detected in any samples <br /> The April 2004 quarterly groundwater-monitoring event indicated that the <br /> groundwater elevation increased approximately 142 feet from the previous <br /> event performed in January 2004 During this event, the average depth to <br /> groundwater was 27 73 feet bgs (-17 97 feet msl) The groundwater flow was <br />' easterly at a gradient approximately 0 005 foot per linear foot Benzene was <br /> not detected in well MW-2 during this event The concentrations of toluene, <br /> ethylbenzene, xylenes, and TPH-G in well MW-2 decreased significantly <br /> from previous events BTEX and TPH-G were not detected in the samples <br /> collected from wells MW-1, MW-3, or MW-4 MTBE was the only <br /> oxygenate detected and only in well MW-2 The detectable concentration for <br /> MTBE was just above the reporting limit <br /> • <br />' 4 <br /> Quarterly Groundwater Monitoring Report <br /> July 2005 <br /> Prepared for SALLA LEE BAKERY GROUP,INC Prepared by Philip Services Corporation <br /> Investigative and Quarterly Report lard Quarurly Report 07_2005(final) September 23,2005 <br />