Laserfiche WebLink
1.2 Chronology of UST-Related Events <br /> ' A 1,000-gallon gasoline UST located beneath the sidewalk along South <br /> Center Street, an associated fuel dispenser located within the building, and the <br /> portion of product piping from the UST to the building were removed in <br /> ' December 1990 The remaining product piping, from the edge of the building <br /> to the former dispenser, was properly abandoned on April 17, 1998 <br /> ' On April 16, 1998, two 1-inch diameter direct-push probeholes were driven <br /> beneath the former UST to collect soil and groundwater samples for <br /> laboratory analysis Analytical results, summarized in the June 2, 1998 <br /> Preliminary Subsurface Site Investigation Results and Product Piping <br /> Abandonment Completion Report, indicated benzene, toluene, ethylbenzene, <br /> and xylenes (BTEX) impact to subsurface soil and groundwater The soil and <br /> ' groundwater samples did not contain detectable oxygenate compounds <br /> In July 1999, Ground Zero Analysis, Inc (GZA) of Escalon, California, <br /> I performed a subsequent subsurface investigation GZA drilled three soil <br /> borings, completed them as groundwater-monitonng wells (MW-1, MW-2, <br /> and MW-3), and collected soil and groundwater samples for laboratory <br /> analysis GZA's Investigation, summarized in their July 28, 1999 <br /> Groundwater Monitoring Well Installation Report, detected BTEX and total <br /> petroleum hydrocarbon as gasoline (TPH-G) impact in soil and groundwater <br /> samples collected at MW-2 Samples collected from MW-1 and MW-3, <br /> placed in hydraulically upgradient positions relative to the former UST, did <br /> not contain detectable petroleum hydrocarbons <br /> ' The SJCEHD required quarterly groundwater-monitoring be performed to <br /> assess contaminant trends, which Included the oxygenate analytes tert-butanol <br /> ' (TBA), methyl-tert-butyl ether (MTBE), di-isopropyl ether (DIPE), ethyl-tert- <br /> butyl ether (ETBE), and tert-amyltnethyl ether (TAME) After several <br /> quarterly events, the laboratory analytical data indicated that higher <br /> concentrations of petroleum hydrocarbons were detected in samples collected <br /> from well MW-2 and non-detectable or lower concentrations were measured <br /> at the upgradient locations <br /> SJCEHD requested that additional investigation be performed to assess the <br /> extent of petroleum Impact PSC submitted a September 24, 2001 Subsurface <br /> ' Site Investigation Workplan to SJCEHD, which proposed further assessment <br /> SJCEHD approved this work plan in a letter dated October 16, 2001 <br /> PSC performed an investigation in March 2002 Six probeholes (PH-3 <br /> through PH-8) were advanced, one groundwater-monitoring well (MW-4) was <br /> installed, one air-sparging well (SP-1) was constructed, one soil-vapor- <br /> extraction well (VW-1) was constructed, and samples of soil and groundwater <br /> were collected for laboratory analysis Investigation findings were submitted <br /> ' z <br /> Quarterly Groundwater Monitoring Report <br /> May 2005 <br /> Prepared for SARA LEE BAKERY GROUP,INC Prepared by Philip Services Corporation <br /> lnvertigatrve and Quarterly Report\2nd Quarterly Report 05_2005(final) September 23,2005 <br />