My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTRAL
>
1034
>
3500 - Local Oversight Program
>
PR0544196
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2019 2:42:52 PM
Creation date
2/27/2019 1:45:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0544196
PE
3528
FACILITY_ID
FA0006536
FACILITY_NAME
WELLS FARGO BANK PROPERTY
STREET_NUMBER
1034
STREET_NAME
CENTRAL
STREET_TYPE
AVE
City
TRACY
Zip
94805
APN
23517127
CURRENT_STATUS
02
SITE_LOCATION
1034 CENTRAL AVE
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Work Plan for Additional Subsurface Assessment;Former Unocal#0123 J <br /> October 12,-2000 <br /> PROJECT STAFF ` <br /> - Mr. Stephen.]. Carter, a Registered Geologist in the State of California (R.G.'No. 5577), will provide <br /> technical oversight and review of.the work. Mr. Greg A. Gurss, Senior Project Manager, will supervise <br /> implementation of field and office operations. GR employs a staff of geologists, 'engineers, and <br /> technicians who will assist with the project. <br /> SCHEDULE <br /> GR anticipates installing the monitoring wells within tw weeks following regulatory approval of the <br /> proposed 'scope of work .and obtaining -approval from tate City of Tracy to install the wells where <br /> proposed, and obtaining the necessary encroachment and well installation permits. A report presenting <br /> the results of the investigation will be submitted within 45 days of the.completion of the proposed field <br /> work. Any difficulties in obtaining the encroachment or r ell installation permits,-or modifications to the <br /> proposed scope of work will result in changes to the proposed schedule: <br /> 2400073.04 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.