Laserfiche WebLink
TABLE OF CONTENTS <br /> 1.0 INTRODUCTION...............................................................................................................................1 <br /> 2.0 PROJECT BACKGROUND..............................................................................................................1 <br /> 1 <br /> 3.0 PROPOSED MONITORING WELL LOCATIONS AND SAMPLE INTERVALS...................3` <br /> 4.0 BORING AND WELL INSTALLATION FIELD PROCEDURES...............................................4 <br /> f4.1 SITE PREPARATION ........................................................................................................................4 <br /> L� <br /> 4.2 MONITORING WELL INSTALLATION FIELD PROCEDURES...................................................5 <br /> 4.2.1 Groundwater Monitoring Well Installation Procedures.................................................................5 <br /> 4.2.2 Soil Vapor Monitoring Well Installation Procedures.....................................................................6 <br /> 4.3 MONITORING WELL SURVEYING, DEVELOPMENT,AND SAMPLING................................6 <br /> 4.4 GROUNDWATER MONITORING WELL DEVELOPMENT, AND SAMPLING.........................7 <br /> 4.5 SOIL VAPOR SAMPLING PROCEDURES......................................................................................7 <br /> 5.0 LABORATORY ANALYSES............................................................................................................5 <br /> 6.0 REPORTING.......................................................................................................................................5 <br /> 7.0 PROJECT SCHEDULE......................................................................................................................9 <br /> APPENDICES <br /> APPENDIX A <br /> Figure 1 —Vicinity Map <br /> Figure 2—Site Map with Boring and Monitoring Well Locations <br /> Figure 3—Site Map with Proposed Soil Boring and Monitoring Well Locations <br /> Figure 4—Generalized Shallow Monitoring Well Construction Diagram <br /> Figure 5 —Cross-Section C-C' {East-West}Historic Soil Analytical <br /> Figure 6—Typical Soil Vapor Probe Construction Diagram <br /> APPENDIX B <br /> Site Specific Health and Safety Plan <br /> Project Model Chains of Custody <br /> �I <br /> A li 1 <br /> CONDOR <br />