Laserfiche WebLink
item Task Status Comments <br /> 3.4 Overfill a.If equipped with a <br /> equipment "test"button, <br /> activate the audible <br /> horn or tight to <br /> confirm operation. t;Yx'es ONo*QN/A <br /> This could be battery <br /> powered.Replace the <br /> battery if needed <br /> b.If overfill valve is <br /> equipped with a <br /> mechanical test <br /> mechanism,actuate Ryes CNo*DN/A <br /> the mechanism to <br /> confirm operation. <br /> 3.5 Piping Check for leaks, <br /> connections corrosion and [R Yes*CNo <br /> damage <br /> 4.0 Tank Attachments and Appurtenances <br /> 4.1 Ladder and Secure with no sign <br /> platform structure of severe corrosion or ales ONo*CN/A <br /> damage. <br /> S.0 Other Conditions <br /> 5.1 Are there other conditions that should be <br /> addressed for continued safe operation or OYes* M <br /> that may affect the sites ill preventionplan? <br />