My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
2800 - Aboveground Petroleum Storage Program
>
PR0515721
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 11:48:10 AM
Creation date
2/28/2019 11:15:47 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515721
PE
2832
FACILITY_ID
FA0007101
FACILITY_NAME
FORWARD INC LANDFILL
STREET_NUMBER
9999
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
20106003
CURRENT_STATUS
01
SITE_LOCATION
9999 S AUSTIN RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AST SP001 ANNUAL INSPECTION <br /> Item Task Status <br /> 3.0 Cathodic Protection <br /> 3.1 Galvanic cathodic Confirm system is functional,includes the wire connections for r Yes r No A N/A <br /> protection s stem galvanic systems. <br /> 3.2 Impressed current a. Inspect the operational components(power switch, meters,and r Yes r No r N/A <br /> system alarms). <br /> b.Record hour meter,ammeter and voltmeter readings. r Yes r No r N/A <br /> c.Rectifier Unit: Make:,Model: <br /> Comments: <br /> 4.0 Tank Shell,Heads, Roof <br /> 4.1 Coating Is the coating in good condition? r Yes r No r N/A <br /> 4.2 Steel condition Is structure free of. <br /> • Dents r Yes r No r N/A <br /> • Buckling I+Yes r No r NIA <br /> • Bulging r Yes r No r NIA <br /> • Corrosion f71 Yes r No r N/A <br /> • Cracking r Yes r No r N/A <br /> 4.3 Roof slope System is free of low points and standing water. F Yes r No r N/A <br /> Comments: <br /> 5.0 Tank Equipment <br /> 5.1 Vents-Primary Components are moving freely and vent passageways are not <br /> obstructed for: r Yes r No r NIA <br /> • Emergency vent covers:Make: Morrison Bros,Model:244, r Yes r No r N/A <br /> Diameter:4 r Yes r No t✓N/A <br /> • Normal Vent:Make: Husky,Model:38CP, Diameter:2 <br /> • Other moving vent components(enter manufacturer and model <br /> number in Comments if available. <br /> 5.2 Vents-Secondary Components are moving freely and vent passageways are not <br /> obstructed for: r Yes r No r N/A <br /> • Emergency vent covers:Make:,Model:,Diameter: r Yes r No r NIA <br /> • SecondaryVenl:Make:,Model:,Diameter: r Yes r No r N/A <br /> • Other moving vent components(enter manufacturer and model <br /> number in Comments if available. <br /> Comments: <br /> 5.3 Valves All valves are free of leaks,corrosion and damage. r Yes r No <br /> 5.3.1 Anti-siphon,check Cycle the valve open and closed and confirmed proper operation. r Yes r No r N!A <br /> and gate valves enter manufacturer and model number in Comments if available <br /> 5.3.2 Pressure regulator Confirmed proper operation.(Note that there may be small, 1/4 inch r Yes r No r N/A <br /> valve drain plugs in the bottom of the valve that are not visible by looking <br /> from above only)(enter manufacturer and model number in <br /> Comments if available) <br /> 5.3.3 Expansion relief valve Confirmed that the valve is in the proper orientation.(Note that fuel [-Yes r No r N/A <br /> must be discharged back to the tank via a separate pipe or tubing.) <br /> enter manufacturer and model number in Comments if available <br /> WO: 6703239 SFPrFIN6ER2m6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.