Laserfiche WebLink
AST SP001 ANNUAL INSPECTION <br /> Item Task Status <br /> 5.11 Overfill equipment a.Follow manufacturers instructions and regulatory r Yes r No r N/A <br /> requirements for inspection and functionality verification. <br /> b.Confirm device is suited for above ground use by the r Yes r No r N/A <br /> manufacturer.Make: ,Model: <br /> Comments: <br /> 6.0 Insulated Tanks <br /> 6.1 Insulation Insulation is free : <br /> • Missing sections r Yes r No r N/A <br /> • Areas of moisture r Yes r No r+N/A <br /> • Mold r-Yes rNo 17 N/A <br /> • Damage r-Yes r No r N/A <br /> 6.2 Insulation cover or jacket Inspected and confirmed that insulation cover or jacket is free r Yes r No R N/A <br /> of damage that will allow water intrusion. <br /> Comments: <br /> 7.0 Miscellaneous <br /> 7.1 Electrical wiring and Are they in good condition? r Yes r No r N/A <br /> boxes <br /> 7.2 Labels and tags • No Smoking r Yes r No r N/A <br /> • NFPA Placards R Yes r No r N/A <br /> • Capacity r Yes r No r N/A <br /> • Contents r Yes r No r N/A <br /> • Fill Procedures <br /> • Emergency Contacts rYes r No r N/A <br /> r Yes R No r N/A <br /> Comments: <br /> Additional Comments: <br /> WO: 6703239 ; TEMBER2016 <br />