My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
6540
>
2800 - Aboveground Petroleum Storage Program
>
PR0521731
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/10/2019 9:45:26 AM
Creation date
2/28/2019 1:05:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0521731
PE
2832
FACILITY_ID
FA0013577
FACILITY_NAME
ITS TECHNOLOGIES & LOGISTICS
STREET_NUMBER
6540
Direction
S
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
18109027
CURRENT_STATUS
02
SITE_LOCATION
6540 S AUSTIN RD
P_LOCATION
01
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SANJ O 1` Q U I `IA,II, Environmental Health Department <br /> COUNTY <br /> Aboveground Petroleum Storage Act Inspection Report <br /> Facility Name: Facility Address: Date: <br /> ITS TECHNOLOGIES&LOGISTICS 6540 S AUSTIN RD, STOCKTON February 05, 2019 <br /> Other Violations <br /> 4010 See below Unlisted Administration/Documentation violation ■V ❑R ❑COS <br /> 4020 See below Unlisted Training violation ❑V ❑R ❑COS <br /> 4030 See below Unlisted Operations/Maintenance violation ❑V ❑R ❑COS <br /> 4040 See below Unlisted Release/Leaks/Spills violation ❑V ❑R ❑COS <br /> 4050 See below Unlisted Abandon ment/lIlegal Disposal/Unauthorized Treatment violation ❑V ❑R ❑COS <br /> SUMMARY OF VIOLATIONS <br /> (CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> Item# Remarks <br /> 103 HSC 25270.6(a)Failed to file HMBP or annual facility tank statement. <br /> A tank facility statement or business plan has not been submitted. The last Hazardous Materials Business Plan was <br /> submitted on October 12, 2017. A tank facility statement identifying the name and address of the tank facility, a <br /> contact person for the tank facility,the total storage capacity of the tank facility, and the location, size, age, and <br /> contents of each storage tank that exceeds 10,000 gallons in capacity and that holds a substance containing at <br /> least 5 percent of petroleum shall be submitted annually. Submittal of a business plan satisfies the requirement to <br /> submit a tank facility statement. Immediately submit a tank facility statement or business plan. <br /> This is a Class II violation. <br /> 301 CFR 112.5(a) Failed to amend Plan as necessary. <br /> There were two 193 gallon diesel generators located in the east and west compressor rooms that were not <br /> addressed in the SPCC plan. There was one 240 gallon gasoline tank located in fueling area that was not <br /> addressed in the SPCC plan. David Carlock and Joe Perez were listed as the designated persons responsible for <br /> on site spill prevention and SPCC. David Carlock and Joe Perez are no longer employed with the company. The <br /> Spill Prevention, Control, and Countermeasure(SPCC) Plan must be amended when there is a change in the facility <br /> design, construction, operation,or maintenance that materially affects its potential for a discharge,within 6 months <br /> of the change, and implemented as soon as possible, not later than 6 months following preparation of the <br /> amendment. Immediately make all necessary amendments to the SPCC Plan to accurately represent the <br /> procedures and policies currently in place at the facility. <br /> Note: There was a 240 gallon waste oil tank located outside the maintenance area which was on site for less than <br /> six months and will need to be added to the SPCC plan. <br /> This is a repeat violation, Class II. <br /> 302 CFR 112.5(b) Failed to review Plan once every five years and/or implement any resulting amendments. <br /> The Spill Prevention, Control, and Countermeasure(SPCC)Plan was last reviewed on October 1, 2010. A review <br /> and evaluation of the SPCC Plan must be conducted at least once every 5 years. As a result of this review and <br /> evaluation,the SPCC Plan must be amended within 6 months of review, and re-certified by a Professional Engineer <br /> if any technical amendments were made. Immediately conduct a review of the facility SPCC Plan and make any <br /> necessary amendments. <br /> This is a Class II violation. <br /> FA0013577 PR0521731 SCO01 02/05/2019 <br /> EHD 28-01 Rev.09/27/2018 Page 4 of 8 Aboveground Petroleum Storage Act OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjcehd.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.