My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2002 - 2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2002 - 2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:14:34 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2003
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
282
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />r Tanknobgy <br />8900 SHOAL CREEK BUILDING 200 <br />TEST DATE: 09/08/03 AUSTIN, TEXAS 78757 (512) 451-6334 WORK ORDER NUMBER: 2228368 <br />CLIENT: VEEDER ROOT - CMS SITE: SAFEWAY 2600 <br />CP installed on: / / <br />COMMENTS <br />TANK TEST RESULTS Test Method: VPLT <br />TANK INFORMATION <br />PSI at tank bottom: <br />Tank ID: <br />87 1 <br />Tank manifolded: NO <br />Bottom to top fill in inches: <br />185.0 <br />Product: <br />REG UNLEAD <br />Vent manifolded: YES <br />Bottom to grade in inches: <br />191.0 <br />Capacity in gallons: <br />20,073 <br />Vapor recovery manifolded: YES <br />Fill pipe length in inches: <br />65.0 <br />Diameter in inches: <br />120.00 <br />Overfill protection: YES <br />Fill pipe diameter in inches: <br />4.0 <br />Length in inches: <br />414 <br />Overspill protection: YES <br />Stage I vapor recovery: <br />DUAL <br />Material: <br />DW STEEL <br />Installed: ATG <br />Stage II vapor recovery: <br />ASSIST <br />CP installed on: / / <br />COMMENTS <br />TANK TEST RESULTS Test Method: VPLT <br />LEAK DETECTOR TEST RESULTS Test method: FTA <br />PSI at tank bottom: <br />New/passed Failed/replaced New/passed Failed/replaced <br />Fluid level in inches: <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />UFT/OFT: <br />Make: <br />VEEDERROOT <br />Fluid volume in gallons: <br />Model: <br />L.L.D. <br />Tank water level in inches: <br />S/N: <br />ELECTRONIC <br />Test time: NOT <br />Open time in sec: <br />Number of thermisters: TESTED <br />Holding psi: <br />NOT <br />Specific gravity: <br />Resiliency cc: <br />TESTED <br />Water table depth in inches: <br />Test leak rate ml/m: <br />189.0 <br />Determined by (method): <br />Metering psi: <br />Leak rate in gph: <br />Calib. leak in gph: <br />3.00 <br />Result: <br />Results: <br />INCONCLUSIVE <br />COMMENTS <br />COMMENTS <br />TOO MUCH AIR IN FUEL LINES. <br />ULLAGE TEST RESULTS Test Method: UTS-4T <br />Test time: <br />Ullage volume: <br />Ullage pressure: <br />Results: <br />DATA FOR LITS -4T ONLY: <br />Time of test 1: <br />Temperature: NOT <br />Flow rate (cfh): TESTED <br />Time of test 2: <br />Temperature: <br />Flow rate (cfh): <br />Time of test 3: <br />Temperature: <br />Flow rate (cfh): <br />COMMENTS <br />LINE TEST RESULTS Test type: PTK-88 <br />Material: <br />Diameter (in): <br />Length (ft): <br />Test psi: <br />Bleedback cc: <br />Test time (min): <br />Test 1: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 2: Start time: <br />Finish psi: <br />Vol change cc: <br />Test 3: Start time: <br />Finish psi: <br />Vol change cc: <br />Final gph: <br />Result: <br />Pump type: <br />Pump make: <br />COMMENTS <br />APT FLEXIB APT FLEXIB <br />1.5 1.5 <br />125.0 125.0 <br />NOT NOT NOT NOT <br />TESTED TESTED TESTED TESTED <br />PRESSURE PRESSURE <br />FE PETRO FE PETRO <br />Impact Valves Operational: NO <br />Printed 10/14/2003 09:18 MSHAW <br />
The URL can be used to link to this page
Your browser does not support the video tag.