Laserfiche WebLink
Ah <br />AL <br />1111111111F 1W <br />INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />iiiIip Tanknology <br />8900 SHOAL CREEK, BUILDING 200 <br />TEST DATE: 09/08/03 <br />AUSTIN, TEXAS 78757 (512) 451-6334 WORK ORDER NUMBER: 2228368 <br />CLIENT: VEEDER ROOT - CMS <br />SITE: SAFEWAY 2600 <br />TANK INFORMATION <br />Tank ID: 89 2 <br />Tank manifolded: NO Bottom to top fill in inches: <br />186.0 <br />Product: PLUS <br />Vent manifolded: YES Bottom to grade in inches: <br />192.0 <br />Capacity in gallons: 10,037 <br />Vapor recovery manifolded: YES Fill pipe length in inches: <br />66.0 <br />Diameter in inches: 120.00 <br />Overfill protection: YES Fill pipe diameter in inches: <br />4.0 <br />Length in inches: 207 <br />Overspill protection: YES Stage I vapor recovery: <br />DUAL <br />Material: DW STEEL <br />Installed: ATG Stage II vapor recovery: <br />ASSIST <br />CP installed on: <br />COMMENTS <br />TANK TEST RESULTS Test Method: <br />VPLT <br />LEAK DETECTOR TEST RESULTS Test method: FTA <br />PSI at tank bottom: <br />New/passed Failed/replaced New/passed <br />Failed/replaced <br />Fluid level in inches: <br />L.D. #1 L.D. #1 L.D. #2 <br />L.D. #2 <br />UFT/OFT: <br />Make: VEEDERROOT <br />Fluid volume in gallons: <br />Model: L.L.D. <br />Tank water level in inches: <br />S/N: ELECTRONIC <br />Test time: <br />NOT <br />Open time in sec: <br />Number of thermisters: <br />TESTED <br />Holding psi: <br />NOT <br />Specific gravity: <br />Resiliency cc: TESTED <br />Water table depth in inches: <br />Test leak rate ml/m: 189.0 <br />Determined by (method): <br />Metering psi: <br />Leak rate in gph: <br />Calib. leak in gph: 3.00 <br />Result: <br />Results: PASS <br />COMMENTS <br />COMMENTS <br />ULLAGE TEST RESULTS Test Method: UTS-4T <br />LINE TEST RESULTS Test type: PTx-88 <br />Test time: <br />Material: APT FLEXIB APT FLEXIB <br />Ullage volume: <br />Diameter (in): 1.5 1.5 <br />Ullage pressure: <br />Length (ft): 125.0 125.0 <br />Results: <br />Test psi: <br />Bleedback cc: <br />Test time (min): <br />DATA FOR UTS-4T ONLY: <br />Test 1: Start time: <br />Time of test 1: <br />Finish psi: NOT NOT NOT <br />NOT <br />Temperature: <br />NOT <br />Vol change cc: <br />Test 2: Start time: TESTED TESTED TESTED <br />TESTED <br />Flow rate (cfh): TESTED <br />Finish psi: <br />Time of test 2: <br />Vol change cc: <br />Test 3: Start time: <br />Temperature: <br />Finish psi: <br />Flow rate (cfh): <br />Vol change cc: <br />Time of test 3: <br />Final gph: <br />Temperature: <br />Result: <br />Flow rate (cfh): <br />Pump type: PRESSURE <br />COMMENTS <br />Pump make: FE PETRO <br />COMMENTS Impact Valves Operational: YES <br />Printed 10/14/2003 09:18 MSHAW <br />