My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2009 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:35:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2012
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAY -07-2009 11:02 Service Station Systems 408 938 8888 P.06 <br />6. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard © Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum E Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0,002" <br />UDC Manufacturer: <br />Western fiberglass <br />UDC Material, <br />Fiberglass <br />UDC Depth: <br />31" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />12„ <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />13" <br />Condition of UDC prior to <br />testing: <br />Good <br />Portion of UDC Tested <br />2" above piping <br />Does turbine shut down when <br />UDC sensor detects liquid (both <br />product and water)?* <br />❑ Yes ❑ No E NA <br />Turbine shutdown response time <br />N/A <br />is system programmed for fail- <br />safe shutdown?' <br />C] Yes ❑ No E NA <br />Was fail-safe verified to be <br />o erational?* <br />❑Yes ❑ No ®NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />30 minutes <br />Test Start Time: <br />1:08 em <br />Initial Reading (Rt): <br />5,7863 <br />Test End Time: <br />1:23 pm <br />Final Reading (Rt): <br />5.7862 <br />Test Duration: <br />15 min. <br />Chane in Reading (R` -R,): <br />-0,0001 <br />Pass/Fail Threshold or Criteria: <br />+/-0.002" <br />Test Result: <br />© pass Fail <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />® Yes ❑ No ❑ NA <br />Comments — (include information on repairs made prior to testing, and reconunended,follow-up,for,failed. tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Replaced tarn penetration trot <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (Sec SWRCB LCr-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.