Laserfiche WebLink
MAY707-2009 11:02 Service Station Systems 408 938 8888 P.07 <br />7. PILL RISER CONTAINMENT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested Q <br />Test Method Developed By: ❑ Sump Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: [] Presstac ❑ Vacuum 0 Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Incon Sump Tester Equipment Resolution: +/- 0.002" <br />fill Sump # 87 Fill Sump # 89 <br />Sume Diameter: <br />42" 42" <br />Sump Depth: <br />75" 75" <br />Height from Tank Top to Top of <br />Highest Pi ing Penetration: <br />16- 16" <br />Height froin Tank Top to Lowest <br />Electrical Penetration: <br />16" 16" <br />Condition of sump prior to <br />testing: <br />Good Good <br />Portion of Sump Tested <br />2" above piping 2" above piping <br />Sump Material; <br />Fiberglass Fiberglass <br />! <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 minutes 30 minutes <br />Test Start Time: <br />9:28 am 9:28 am <br />Initial Reading (R,): <br />4.6408 4.5776 <br />Test End Time: <br />9:43 am 9:43 am <br />Final Reading (RF): <br />4.6409 I 4.5767 <br />Test Duration: <br />15 min. 1 15 min. <br />Chane in Reading (RF-Ri): <br />+0.0001 -0.0009 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" +/- 0.002" <br />1 <br />Test Result: <br />® Pass Fail ; ® Pass Fail <br />Is there a sensor in the sump? <br />9 Yes ❑ No 0 Yes Q No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes ❑ No ® NA ❑ Yes ❑ No ® NA <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA ® Yes ❑ No [INA <br />Was sensor properly replaced and <br />verified functional after testing? <br />®Yes El No El NA Yes El No ❑ NA <br />Comments — (include infonnation on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />37 fill sump — replaced torn conduit boot and sealed scam <br />89 fill sump — replaced torn conduit boot <br />TOTAL P.07 <br />