Laserfiche WebLink
FEB -04-2009 20:21 Service Station Systems <br />Monitoring System Certification - Pr '; of 3 <br />408 938 8888 P.05 <br />Site Address: 1804 West 11Th. Street L Corral Hallow Date of Testing/Servicing: 12/29/08 <br />F. In - Tank Gauging / SIR Equipment: <br />l P Check this box if tank gauging is used only for inventory control. <br />❑ Chock this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform teak detection monitoring. <br />Cmmnlett- the fallnwina rherklict- <br />Yes <br />❑ No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />❑ No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Yes <br />❑ No* <br />Was accuracy of system product level readings tested? <br />l?Yes <br />❑ No* <br />Was accuracy of system water level readings tested? <br />P Yes <br />a No. <br />Were all probes reinstalled property? <br />Yes <br />❑ No* <br />iWere all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLD's are not installed. <br />II <br />1pYes <br />❑ NO <br />For equipment start-up or annual equipment certification w a leak simulated to verify LLD performance? <br />❑ N/A <br />(Check all that apply) Sitnulated leak reate:1� 3 g.p_h ); ❑ 0.1 g.p.h. (2.); ❑ 0.2 g.p_h. (2.). <br />Notes: 1. Required for equipment start-up eerti tion and annual certification. <br />2. Unless mandated by local a encu rtification required only for electronic LLD start-up. <br />5PYes <br />❑ No* <br />Were all LLD's confirmed operational and curate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calf ated? <br />❑ Ycs <br />❑ No* <br />For mechanical LLD's, does the L restrict product flow if it detects a leak? <br />N/A <br />$ Yes <br />❑ No* <br />For electronic LLD's. does turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />Oji Yes <br />[I No* <br />For electronic LLD's, oes the turbine automatically shut off if any portion of the monitoring system is disabled <br />p N/A <br />or disconnected? <br />FFYes <br />❑ No* <br />For electronic LA's, does the turbine automatically shut off if any portion of the monitoring system <br />❑ N/A <br />malfunctions Vfdils a test'' <br />ibYes <br />❑ No* <br />Por electro c LLD's, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />Yes <br />❑ No* <br />Were, 1 items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, discribe bow and when these deficiencies were or will be corrected. <br />H. Comments: <br />' I ,. J <br />