My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2009 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:35:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2012
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAR -20-2009 09:33 Service Station Systems 408 938 8888 P.04 <br />TANK ANNITLAR TFNTING <br />Test Method Developed By: ❑ Tank Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Specify) <br />Test Method Used: ❑ Pressure 0 Vacuum ❑ Hydrostatic <br />p Other (Specify) <br />Test Equipment Used: Test plugs, vernturi pump and gauges Equipment Resolution: 0.5% of span <br />Tank # 87 Tank # 89/91 <br />Is Tank Exempt From Testing?' [IYes ® No ❑Yes ® No <br />Tank Capacity: <br />20k 20k <br />Tank Material: <br />Steel Steel <br />Tank Manufacturer: <br />Modern welding Modern welding <br />Product Stored: <br />Gasoline Gasoline <br />Wait time between applying <br />pressure/vacuum/water and <br />10 min. 10 min <br />starting test: <br />Test Start Time: <br />8:30 am 9:00 am <br />Initial Reading (RO: <br />7" 7" <br />Test End Time: <br />9:30 am 10:00 am <br />Final Reading (RF): <br />7" 7" <br />Test Duration: <br />1. hour 1 hour <br />Change in Reading (Rr RO: <br />None None <br />Pass/Fail Threshold or Criteria: <br />No detectable loss No detectable loss <br />Test Result: <br />© Pass )rail ® Pass rail <br />Was sensor removed for testing? <br />0 Yes ❑ No ❑ NA ® Yes ❑ No a NA <br />Was sensor properly replaced and <br />®Yes p No LI NA ®Yes p No ❑ NA <br />verified functional after testing? <br />Comments — (include information on re airs made prior to testing, and recommended follow -u or failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />Seoondaxy co+atijament systems where the contimiam monitoring autamadcany monitors Troth the primary and secandarq <br />containment, stuff as systems that are hydrostatically monitored or under consmarcacuam; ane exempt fC m periodic containment <br />testing. {Ca itr+rn4 Cede of Regulations, Title 23, Section 2637(a)(6)1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.