Laserfiche WebLink
JAN -20-2009 09:33 Service Station Systems <br />5. SECONDARY PIPE <br />408 938 8888 P.05 <br />Test Method Developed By: ❑ Piping Manufacturer ® Industry Standard ❑ Professional Engineer <br />I-1 Other (Soecifv) <br />Test Method Used: ® pressure ❑ Vacuum C7 Hydrostatic <br />❑ Other (Specify) <br />Test Equipment Used: Test reducer boots, Nitrogen and ,gauges Equipment Resolution: 0.5% of span <br />Piping Run # 87 A Piping Run # 87 B Piping Run # 89 A Piping Run # 89 B <br />Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br />Piping Manufacturer: <br />Western fiberglass <br />Western fiberglass <br />Western fiberglass Western Fiberglass <br />Piping Diameter: <br />2" <br />2" <br />2" 2 <br />Length of Piping Run: <br />150' <br />150' <br />I50' 150' <br />Product Stored: <br />Gasoline <br />Gasoline <br />Gasoline Gasoline <br />Method and location of <br />piping -run isolation: <br />Reducer BootstFittings <br />Reducer Boots/fIttings <br />Reducer Boots/FSttings Reducer Boots/fittings <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 minutes <br />10 minutes <br />10 minutes 10 minutes <br />Test Start Time: <br />10:00 am <br />10:00 am <br />8:30 am 8:30 am <br />Initial Reading (RT): <br />5 psi <br />5 psi <br />5 psi 5 psi <br />Test End Time: <br />11:00 am <br />11:00 am <br />9:30 am 9:30 am <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi 5 psi <br />Test Duration: <br />1 hr_ <br />1 hr. <br />1 hr. 1 hr. <br />Change in Reading (Rr-Rj): <br />none <br />none <br />none none <br />Pass/Fail Threshold or <br />Criteria: <br />No detectable Loss <br />No detectable Loss <br />No detectable Loss No detectable Loss <br />Test Result: <br />El Pass rail <br />® Pass 1+ai1 <br />0 Pass Fail M Pass rail <br />Comments — (include infomiation on repairs made prior to testing, and recommended ollow-up for failed tests) <br />