My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
1987
>
2300 - Underground Storage Tank Program
>
PR0517565
>
COMPLIANCE INFO 2009 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:31 AM
Creation date
2/28/2019 4:35:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2012
RECORD_ID
PR0517565
PE
2361
FACILITY_ID
FA0013503
FACILITY_NAME
SAFEWAY FUEL CENTER #2600
STREET_NUMBER
1987
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
1987 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
379
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN -20-2009 09:35 Service Station Systems 408 938 8888 P.11 <br />11. FII.I. RISER CONTAINMCNT SUMP TESTING <br />Facility is Not Equipped With Fill Riser Containment Sumps ❑ <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ <br />Test Method Developed By: Q Sump Manufacturer 0 Industry Standard ❑ Professional Engineer <br />© Other (Specify) <br />Test Method Used: p Pressure ❑ Vacuum ® Hydrostatic <br />p Other (Specify) <br />Test Equipment Used: Irecon Sump <br />Tester Equipment Resolution: +/- 0.002" <br />Fill Sump #► 87 Fill Sump # 89 Pill Sump # 91 <br />iameter: <br />rHeight <br />42" <br />42" <br />42" <br />Depth: <br />75" <br />75" <br />75" <br />from Tank Top to Top off <br />Highest Piping Penetration: <br />16" <br />16" <br />16" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />16" <br />16" <br />16" <br />Condition of sump prior to <br />testing- <br />estin :Portion <br />Good <br />Good <br />Good <br />Portionof Sum Tested <br />2" above pipinZ <br />2" above piping <br />2" above piping <br />Sump Material: <br />Fiberglass <br />Fiberglass <br />Fiberglass <br />Wait time between applying <br />pressure/vacuum/water and <br />startin test: <br />30 minutes <br />30 minutes <br />30 minutes <br />Test Start Time: <br />7:50 am <br />7:50 am <br />7:50 aln <br />Initial Reading (RO: <br />2.2472 <br />5.3252 <br />3.6083 <br />Test End Time: <br />8:0.5 am <br />8:05 am <br />8:05 am <br />Final Reading (RF): <br />1.1984 <br />5.3125 <br />3.6075 <br />Test Duration: <br />15 min. <br />15 min. <br />15 min. <br />Change in Reading (RF -R,): <br />-1.0488 <br />-0.0127 <br />-0.0008 <br />Pass/Fail Threshold or Criteria: <br />+/- 0.002" <br />+/- 0.002" <br />+/- 0.002" <br />Test Result: <br />Pass 0 Fail <br />Pass El hail <br />® Pass Fail <br />Is there a sensor in the sump? <br />0 Yes [I No <br />® Yes ❑ No <br />® Yes ❑ No <br />Does the sensor alarm when <br />either product or water is <br />detected? <br />❑ Yes ❑ No ® NA <br />❑ Yes ❑ No 0 NA <br />[I Yes [3 No ® NA <br />Was sensor removed for testing? <br />® Yes ❑ No ❑ NA <br />M Yes ❑ No ❑ NA <br />® Yes p No ❑ NA <br />Was sensor properly replaced and®yes <br />verified functional after testing? <br />❑ No 0 NA <br />®Yes E]No 0 NA <br />®Yes [INo LlNA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />"Sensor functionality was not confirmed. This procedure is not part of the Secondary Containment testing scope of work". <br />87 and 89 fill sumps failed. Both had torn conduit boots. Need two (SBS4B 1.4) blueline <br />TOTAL P.11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.