NOTES <br />1, CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN <br />INTENT AND TME CONTRACTOR IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD <br />CONDITIONS AND INSTALLATION TECHNIQUES. <br />2, SIJPPLY, RETURN AND VENT PIPING ISTO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1,14" PER FOOT <br />PREFERRED SIPHON PIPING TO SLOPE 1,14" PER FOOT, <br />3, SECONDARY CONTAJNMENTPIPING IS SHOWN BY NOTE ONLY. NOT GRAFL-IICALLY, AL.LPRODUC7 PIPING <br />TO BE DOUBLE CONTAINMENT PIPE ROUTED IN TER71ARY CONTAINMENT DUCT. ALL- VENTAND VAPOR <br />PIPING TO BE DOUBLE WALL PER PIPING. <br />INSTALLATION NOTES <br />'I i INSTALL KIEV-,/ 2" SINGL,E \NAL.I_ FIBERGLASS PIPE TO VENT RACK SLOPE NEW PIPING 1l8" PER F F. MIN, <br />BACK DOWN TO POINT OF INTERCEPTION. PERFORM ALL NECESSARY INTEGRITY TESTING ON NEW <br />VENT PIPING. BACKFILL. PIPE TRENCH AND REPAIR AFFECTED LANDSCAPING TO MATCH EXISTING <br />CONDITION. REPAIR AL.LA.0 PAVING 'TO MATCH EXISTING, AND RESTRIPE ALL AFFECTED AREAS. <br />2 i CONTRACTOR TO INSTALL (1) NEW 2" BLACK IRON RISER PIPE WITH RAIN CAP FOR DIESEL. MOUNT NEW <br />RISER PIPE TO NEW VENT RACK ASSEMBLY. <br />NOTUSED <br />4 INSTALLA/AYNE VISTA SERIES V595. DUAL HOSE PER SIDE (3+ 1) PRODUCT DISPENSERS WITH DIESEL, <br />ON EXISTING ISLANDS NEW DISPENSER TO BE, FITTED WITI-i MEALY VP '1000 VAPOR PUMPS AND <br />VEEDER-ROOT ISD MONITORING DEVICES. REINSTALL HEALY EVR HOSES, NOZZLES AND BREAKAWAY <br />VALVES, EXISTING CONTAINMENT SUMPS AND SENSORS TO REMAIN, START UP BY MANUFACTURERS <br />CERT IF EDTECHNICIAN. GENERAL CONTRACTOR TO PURGE LINES WITH A MINIMUM OF 200 GALLONS <br />THROUGH EACH HOSENOZZILE. ANY AIR POCKETS OR START UP PROBLEMS LINE TO IMPROPER <br />INSTAILLA NON (DR INCORRECT WRING THAT DESTROYS ELECTRONICSA/111. BE BILLED BACK TO THE <br />CON I RACTOR. AFTER PURGING THE PRODUCT LINES OF AIR AND BEFORE THE TESTING, CONTRACTOR <br />TO PERFORM ALL REQUIRED VAPOR RECOVERY TESTING PER CARES E.O. VR -202 AND LOCAL AIR <br />POLLU I ION CONTROL AUTHORITY AND FORWARD RESULTS -TO OWNER AND TO JURISDICTION AS <br />SPECIFIED IN THE PERMIT CONDI "PIONS. <br />5 CONTRACTOR TO INSTALL NEW ATG FLOAT KIT FOR DIESEL FUEL AT 10,000 G'ALI-ON DIESEL <br />COMPARTMENT. <br />6 RE -LAPEL FORMER TANK, PER I ATEST API AND SAFEWAY STANDARD. <br />DIGAL <br />DIAL TOLL FREE <br />1-800-227-2600 <br />_VV0 DAYS <br />AT LEAST I <br />BEFORE YOU DIG <br />2 <br />SUBMITFAI <br />[SATES <br />C) <br />REVISIONS <br />0 <br />TO CONIMENTS <br />< <br />AUGUST 21, 2.009 <br />A& <br />91,DIESEL TANK REVISION <br />W <br />w <br />MARCH 19,2010 <br />/N <br />Lo <br />C) <br />CD <br />< <br />(7) Q) <br />ui <br />L6 <br />> <br />c -D <br />00 <br />LL <br />C/) <br />E <br />C7- <br />SUBMITFAI <br />[SATES <br />C) <br />REVISIONS <br />0 <br />TO CONIMENTS <br />< <br />AUGUST 21, 2.009 <br />A& <br />91,DIESEL TANK REVISION <br />W <br />w <br />MARCH 19,2010 <br />/N <br />Lo <br />C) <br />< <br />(7) Q) <br />ui <br />L6 <br />> <br />c -D <br />00 <br />LL <br />SUBMITFAI <br />[SATES <br />C) <br />REVISIONS <br />ARESPONSE <br />TO CONIMENTS <br />< <br />AUGUST 21, 2.009 <br />A& <br />91,DIESEL TANK REVISION <br />W <br />w <br />MARCH 19,2010 <br />/N <br />SUBMITFAI <br />[SATES <br />C) <br />CD <br />60 <br />< <br />N <br />W <br />0 <br />Z <br />o <br />LL <br />W <br />w <br />U) <br />< <br />C) <br />< <br />ui <br />< <br />c -D <br />00 <br />LL <br />C/) <br />�S H E �MT �IT L E <br />