Laserfiche WebLink
0 <br />0 <br />J <br />J <br />0 <br />2 <br />J <br />I..L <br />ry <br />0 <br />U <br />i <br />i <br />EXISTING <br />LANDSCAPING <br />I <br />0 <br />EXISTING OBSERVATION/ <br />MONITORING WELL <br />- TYPICAL OF (2) <br />r; <br />I EXISTING TANK SLAB <br />___ ...... i. ....... ..... <br />.. <br />f. <br />II <br />Q � , <br />B EXISTING DUAL TURBINE <br />II <br />TANK #1 <br />0 <br />(87 OCTANE) <br />20,000 GALLON <br />EXISTING FILL, VENT, <br />STAGE IAND IIVAPOR <br />RETURN <br />TYPICAL _ V <br />EXISTING ANNULAR <br />1 <br />F <br />-- <br />F - <br />! <br />! <br />I <br />EXISTING 3" FRP <br />I <br />I <br />I <br />U <br />I.M. A0uLmrtij <br />& 0 <br />TYPICAL OF (10) <br />R <br />- M <br />1 SPACE SENSOR I r P -_ - - - P-�- -----. P ..,. — �. - -- P j <br />I s I I I <br />b I <br />VR <br />5 =1 2 � I ! <br />i j I <br />3 VR VR VR VR <br />10,0 0 GALLON I EXISTING 1-1/2" �� EXISTING 1-112" 1 0 EXISTING 1-112" I � EXISTING 1-1/2" % <br />INSIDE 4" ° INSIDE 4" INSIDE 4" <br />4 -. � I I I I INSIDE 4" I -� <br />�� f 1 I I I <br />1 <br />EXISTING SINGLE "_ � _ EXISTING 2" FRP I EXISTING 2" FRP I EXISTING 2" FRP J EXISTING 3" FRP <br />_L_.., - <br />TURBINE sEll <br />B <br />`�j <br />TANK�#3 __ R ___ - ___ ____. _— - R ..._.._ _ .. s_ _ __ _ R _. _ __ R_ -- <br />M <br />_ .._ _ .._... P _ _ -..... –_ _ _ - - - P I P --_..... P ._ <br />, <br />i r I- -� <br />(91 OCTANE) I I I I <br />EXISTING LEVEL GAUGE 10,000 GALO <br />TYPICAL OF (3) r _ - .._ .._.... -- _ VR VR <br />EXISTING 3' FRP EXISTING 3" FRP EXISTING 3" FRP EXISTING 3 FRP <br />EXISTING SINGLE L ....._._ _.._. - _-. _.. <br />TURBINE ,'n� -.�-_ ..... _ ..,_ ....... -.._, ..._...._.. _- _ .... <br />EXISTING <br />LANDSCAPING <br />SAN JOAQUIN "CUNN t T <br />ENVIRONMENTAL. HEALTHPli <br />600 E. MAIN ST. `` <br />STOCKTON CA 96202 <br />(209) 468-3420 \ <br />C] Approved <br />Approved with changes: See Rema" <br />Disapproved: See Reinar s <br />Remarks r' <br />EXISTING <br />LANDSCAPING <br />g hereon anxic!10 not �;L.1t�oarize or approve any omission or <br />WEST 11 th STREET <br />deviation frum rcquirements of state laws or local ordinances. <br />SCALE 1"=10' <br />10 0 10 20 <br />do <br />PROJECT DATA <br />SITE ADDRESS: 1301 W. 11TH STREET, TRACY, CA <br />GOVERNING JURISDICTION: CITY OF TRACY <br />A.P.N.: 232-170-24 <br />PROJECT DESCRIPTION: PERFORMING A (4) DISPENSER DIESEL CONVERSION <br />PROJECT DIRECTORY <br />APPLICANT: ENGINEER/AGENT <br />SAFEWAY, INC. LHB & ASSOCIATES <br />5918 STONERIDGE MALL ROAD 586 HIGUERA STREET, SUITE 200 <br />PLEASANTON, CA 94588-3229 SAN LUIS OBISPO, CALIFORNIA 93401 <br />TEL: (925) 467-2707 TEL: (805) 540-5240 <br />FAX: (925) 467-2740 FAX: (805) 540-5241 <br />VICINITY MAP <br />WEST 11TH STREET <br />KRONR <br />SI E <br />PIPING LEGEND <br />V- - --- - - EXISTING FIBERGLASS VENT PIPING <br />--"VR - ---- EXISTING FIBERGLASS VAPOR RECOVERY PIPING <br />- --P--- EXISTING PRODUCT PIPING (P=PREMIUM, M=MID-GRADE, R=REGULAR, D=DIESEL) <br />- - - —V— - - - - NEW SINGLE WALL FIBERGLASS VENT PIPING <br />NOTES: <br />1. CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN <br />INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST PIPING LOCATIONS BASED ON ACTUAL FIELD <br />CONDITIONS AND INSTALLATION TECHNIQUES. <br />2. SUPPLY, RETURN AND VENT PIPING IS TO SLOPE TOWARD TANK 118" PER FOOT MINIMUM, 114" PER FOOT <br />PREFERRED. SIPHON PIPING TO SLOPE 114" PER FOOT. <br />3. SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT PIPING <br />TO BE DOUBLE CONTAINMENT PIPE ROUTED IN TERTIARY CONTAINMENT DUCT. ALL VENT AND VAPOR <br />PIPING TO BE DOUBLE WALL FRP PIPING. <br />DEMOLITION Nu4*m"TEt00`i' <br />EXISTING (1) 20,000 GALLON REGULAR UNLEADED AND (1) IM00110,000 GALLON PREMIUM/MID-GRADE <br />DUAL COMPARTMENT DOUBLE WALL FIBERGLASS CsOAi-EG STEEL TANKS (GLASTEEL II) AS <br />MANUFACTURED BY "MODERN WELDING.' THE ANNULAR SPACES OF THE TANKS ARE MONITORED WITH <br />EXISTING LIQUID SENSORS BY VEEDER ROOT. TANKS HAVE EXISTING SINGLE WALL FILAND TURBINE <br />SUMPS MONITORED BY EXISTING "VEEDER €:OCT " STANDARID LIQUID SENSORS. <br />\ CONTRACTOR TO PUMP OUT EXISTING 10,000 TANK PRODUCT INTO 20,000 87 OCTANE TANK. 10,000 <br />GALLON 89 MID -GRADE TANK TO BE CONVERTED TO DIESEL <br />G) CONTRACTOR TO ACCESS FORMER 10,000 GALLON TANIK FILL%SPILL MULTIPORT, AND REMOVE PHASE I <br />VAPOR RECOVERY CAP AND ADAPTOR. CAP PORT FOR FUTURE USE. <br />\ CONTRACTOR TO ACCESS FORMER 10,000 GALLON TANK TURBINE SUMP, AND REMOVE GASOLINE <br />aCONTRACTOR TO [$OLATE IN-PLACE THE UNDERGROUND VENT UNE FROM THE EXISTING MANIFOLD <br />TO THE TANK BEING CCNVERTED TO DIESEL, SAIFVCUT AND REMOVE EXISTING CONCRETE AND A.C. <br />PAVEMENT AS REQUIRED FOR IN STALAT#ON OF THE DEDICATED 2" DIESEL VENT LINE. <br />( D (10) EXISTING'ORESSER-WAYNE 31V3901) DISPENSERS VVITH PHASE 11 EVER AND ISD. CONTRACTOR TO <br />REMOVE (4) EXISTING DISPENSERS, AND DELIVER TO A LOCATION PER SAFEWAY REPRESENTATIVE'S <br />DIRECTION. REMAINING (6) NON -BLEND DISPENSERS -0 5E CONVERTED TO (3+0) BLENDERS. SPARE <br />PIPE TO BE CAPPED INSIDE EACH 3+0 DISPENSER CONTAINMENT SUMP. ENTIRE PIPE RUN SHALL <br />REMAIN CONNECTED TO THE EXISTING MONITORING SYSTEM, <br />C 0 M P L I A N C" E N''O"' T E S <br />1 . ALL MNIENSIONS AND CONDITIONS 8HAL L BE CHECKED AND' ERIFIED IN THE FIELD BEFORE <br />STARTING ANY WORK. ANY DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS <br />ENGINEkR FOR HIS DFOISION BEFORE PROCEEDING WITH THE WORK. <br />4. GENERAL CONTRACTOR SHALE. OBTAIN NECESSARY PERMIT FROM APPLIC:AELE AGENCIES FOR <br />CXCAVATiONS OF TR.CNCHES ;i' -G" OR MORE IN DEPTH INTO WHICH A PERSON ES RF{1UIRED TO <br />DESCEND. <br />3. ALL MATERIALS SHALL BE COMPATIBLE. WITH USE FOR THE, INTENDED PURPOSE AS PER <br />NATIONALLY RECOGNIZED CODES, LOCAL CODES AND GOVERNING AUTHORITIES. <br />4. FUELING SYSTEM To BE INSPECTED PER LOCAL REGULATING AGENCIES AND BY OWNERS <br />REPRESENTATIVE PRIOR TO BEING PLACED BACK IN SERVICE. <br />5. TANK SYaTEM, LEAK DE TECTCRS ANC? MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND <br />APPROVED EY Q OVERNING AGENCY PR*R TO TANK SYSTEM BEING PLACED IN OPERATION (AS <br />APPLICABLE). <br />6. PRIOR TO FUEL BEING PUMPED, STATION MUST HAVE VEF_-OER ROOT rUNCTIONALAND <br />MONITORING ANNULAR SPACES OF TANK, <br />7. REFERENCED CODES SHALL INCLUDE 2007 CBC; 2007 CFC; 2007 CEC; 2007 CMC. <br />8. FIRE SAFETY DURING CONSTRUCTION SHALL. FOLLOW 2007 CFC CHAPTER 14. FIRE <br />EXTINGUISHERS SHALL BE PROVIDED. THE AUTOMATIC FIRE SPRINKLER SYSTEM (IF PRESENT) 15 <br />TO REMAIN IN SERVICE AT ALL TIMES, UNDER NO CIRCUMSTANCE SHALL THE FIRE SPRINKLER <br />SYSTEM BE LEFT OUT OF SERVICE OVERNIGHT. <br />DIGA, <br />DIAL TOLL FREE <br />1-800-227-2600 <br />AT LEAST TWO DAYS <br />BEFORE YOU DIG <br />UNDERGROUND SERVICE ALERT OF CALIFORNIA <br />,�FLOFESSIpA,\ <br />�FREY <br />ti <br />No. 51640 m <br />* exp. 06/30110 <br />��yTF CIV 1 <br />\ OP CALIF/ <br />1J 11 <br />110 <br />L <br />C cL Q <br />LO <br />2 0C?. <br />N <br />z <br />� <br />LL <br />F <br />3 <br />J <br />= <br />F <br />U <br />w U a <br />Q <br />U <br />L <br />Lu <br />Q00 <br />7 <br />L V AV <br />,�FLOFESSIpA,\ <br />�FREY <br />ti <br />No. 51640 m <br />* exp. 06/30110 <br />��yTF CIV 1 <br />\ OP CALIF/ <br />REVISIONS <br />RESPONSE TO COMMENTS <br />1 AUGUST 21, 2009 <br />A <br />A <br />SUBMITTAL <br />DATES <br />OWNER: <br />01/28/09 <br />REG. AGENCIES <br />01/28/09 <br />O.T. B.: <br />01/02/09 <br />PROJECT NO. <br />08-41 <br />DRAWN BY: <br />JRB <br />CHECKED BY: . <br />KEE <br />CAD SAVED NAME: <br />08-41 C1-1.dwg <br />0 <br />1J 11 <br />110 <br />L <br />C cL Q <br />LO <br />2 0C?. <br />N <br />z <br />� <br />LL <br />U6�0 <br />J <br />= <br />U <br />w U a <br />Q <br />U <br />L <br />Lu <br />Q00 <br />� N m <br />LL <br />x <br />vr n�r1 <br />O <br />c <br />N N <br />o <br />O � U <br />N <br />rn� <br />REVISIONS <br />RESPONSE TO COMMENTS <br />1 AUGUST 21, 2009 <br />A <br />A <br />SUBMITTAL <br />DATES <br />OWNER: <br />01/28/09 <br />REG. AGENCIES <br />01/28/09 <br />O.T. B.: <br />01/02/09 <br />PROJECT NO. <br />08-41 <br />DRAWN BY: <br />JRB <br />CHECKED BY: . <br />KEE <br />CAD SAVED NAME: <br />08-41 C1-1.dwg <br />0 <br />1J 11 <br />110 <br />L <br />C cL Q <br />LO <br />2 0C?. <br />U U Q <br />REVISIONS <br />RESPONSE TO COMMENTS <br />1 AUGUST 21, 2009 <br />A <br />A <br />SUBMITTAL <br />DATES <br />OWNER: <br />01/28/09 <br />REG. AGENCIES <br />01/28/09 <br />O.T. B.: <br />01/02/09 <br />PROJECT NO. <br />08-41 <br />DRAWN BY: <br />JRB <br />CHECKED BY: . <br />KEE <br />CAD SAVED NAME: <br />08-41 C1-1.dwg <br />0 <br />Q <br />CV <br />W <br />�o <br />O <br />z <br />� <br />LL <br />w <br />i17 <br />J <br />= <br />U <br />Q <br />U <br />o <br />Lu <br />Q00 <br />T <br />LL <br />vr n�r1 <br />SHEET TITLE <br />USTAND <br />0 <br />PIPING SITE <br />PLAN AND <br />DEMOLITION <br />NOTES <br />0 <br />V <br />SHEET NO. <br />T.. <br />v <br />C 1-1 <br />42 <br />c <br />(7 <br />