My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001497
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHANNEL
>
1649
>
3500 - Local Oversight Program
>
PR0544207
>
ARCHIVED REPORTS XR0001497
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/1/2019 2:37:09 PM
Creation date
3/1/2019 1:59:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0001497
RECORD_ID
PR0544207
PE
3528
FACILITY_ID
FA0005237
FACILITY_NAME
N A GOTELLI TRUCKING INC
STREET_NUMBER
1649
Direction
E
STREET_NAME
CHANNEL
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
15304021
CURRENT_STATUS
02
SITE_LOCATION
1649 E CHANNEL ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 5 <br /> ANALYTICAL RESULTS FOR BORINGS MW-1, MW-2 & MW-3 <br /> Mid-Cal Leasing <br /> 1649 East Channel Street, Stockton, California <br /> March 9 and 10, 1993 <br />' <br /> (mg/kg) <br /> Ethyl- <br /> Sample ID TPH as Gas Benzene Toluene benzene Xylene <br />' MW1-40 ND ND ND ND ND <br /> MW1-50 ND ND ND ND ND <br /> MW2-35 ND ND ND ND ND <br />' MW2-45 ND 00079 ND ND ND <br /> MW2-50 ND ND ND ND ND <br /> i MW3-40 ND ND ND ND ND <br /> MW3-50 ND ND ND ND ND <br />' m g=parts per miLhon m <br /> ND =Not detected <br /> On March 17, 1993, the water level in each well was measured, the wells were purged, and <br /> water samples were collected The initial gradient direction was determined to be 0 0073 ft/ft <br /> directed S 7° W Benzene and xylene were detected in MW-2 at 3 7 µg/L and 1 1 ug/L, <br />' respectively A summary of all analytical results for groundwater samples is presented as <br /> Table 6 <br /> 3.4 Quarterly Groundwater Monitoring <br /> Between June 1993 and September 1994, monitoring wells at the site were sampled a total <br />' of six times Prior to each sampling, the depth to groundwater was measured in each well <br /> using a Solinst water level meter The wells were purged of standing water to stabilize pH, <br /> temperature and conductivity using submersible pumps or PVC bailers Purge water was <br /> stored on-site in 55-gallon DOT drums All samples were collected using disposable bailers <br /> and were analyzed by a state-certified laboratory for TPH as gasoline and BTE&X <br /> H3stoncaI groundwater depths are included in Table 6 <br /> I <br /> 3.4.1 Groundwater Sampling, June 1993 <br /> A second sampling event occurred on June 24, 1993 Between March 1993 and June 1993 <br /> water levels rose approximately 2 to 2 5 feet in all wells (see Table 5) The gradient <br />' direction for the June sampling event was determined to be 0 0025 ft/ft directed S 70° E <br /> 0-69-1 Audi S.—I.. 5 <br /> M-1-C-114 <br /> 1 R--d MA 6U91 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.