Laserfiche WebLink
TABLE <br /> Soil Boring and Well Construction Details <br /> Stockton Charter Way Commingled Plume <br /> 440,441, and 508 West Charter Way and 1444 South Lincoln Street, Stockton, CA <br /> 'Borehole. Casing Screened Fllter Pack Bentonite Seal Cement Seal Water <br /> Installation Total Depth Casing Slot Slze <br /> Location Lb, -Date Diameter Diameter Interval Interval Interval interval Bearing Comments - - <br /> t-- (feet I '(inches finches Material (inches) feet s <br /> ( (feet b s) (feet s feetb s Zone _ <br /> Former ARCO Service Station No.2168 <br /> Soil Borings(B) <br /> B-1 07/16/91 - 31.5 8 - - - - - - 0-31.5 - <br /> B-2 07/16/91 - 42.5 8 - - - - - - 0-42.5 - <br /> B-3 07/17/91 - 21.5 8 - - - - - - 0-21.5 - <br /> Bd 07/17/97 - 21.5 8 - - - - - - 0-21.5 - <br /> B-5 04/27/92 - 56 10 - - - - - - - - see MW-t for details <br /> B-6 042852 - 56 10 - - - - - - - - see MW-2 fordetails <br /> B-7 04/29/92 - 41 6.25 - - - - - - odi - <br /> B5 05/05/92 - 56 10 - - - - - - - - we MW-3 for details <br /> B-9 05/06/92 - 41 10 - - - - - - - see VW-7 for details <br /> B-10 05/07/92 - 40 10 - - - - - - - see V W-2 for details <br /> B-11 05/07/92 - 40 10 - - - - - - - - see VW-3 for details <br /> B-12 05/06/92 - 40 8 - - - - - - 0.40 - <br /> B-13 01/11/93 - 41 8.25 - - - - - - - - we VW-4 for details <br /> B-14 01/11/93 - 57 10.25 - - - - - - - see MWd for details <br /> B-15 01/12/93 - 14.5 6.5 - - - - - 0-14.5 - <br /> B-16 01/12/93 - 57 10.25 - - - - - - _ - see MW-5 for details <br /> B-17 01/12/93 - 26 8.25 - - - - - - - - see VW-5 for details <br /> B-18 01/13/93 - 40 8.25 - - - - - - - - seeVW-6fordetails <br /> B-19 01/13/93 - 41 8.25 - - - - - - - - we VW-7 for details <br /> B-20 10/0653 - 53 8.25 - - - - - - - - see MW-6 for details <br /> B-21 10/07/93 - 50 8.25 - - - - - - - see MW-7 for details <br /> B-22 07/24/96 - 26 10 - - - - - - - see VW-13 for details <br /> B-23 07/2456 - 26 10 - - - - - - - - see VW-12 for details <br /> B-24 072456 - 26 10 - - - - - - - see VW-11 for details <br /> B-25 1 0724/96 1 26 1 10 1 - - - - - - - - see VW-10 for details <br /> Angle Boring(B) <br /> B-13 05/12/95 - 26 8 - _ - - - - 0-26 - <br /> Monitoring Wells(MW) <br /> AMW-1 042752 11.767 56 10 4 SCH.40 PVC 0.12 36-56 33.5-56 31-33.5 0-31 B installed in B-5 <br /> AMW-7B 08/01/00 11.630 90 16/8 2 SCH.40 PVC 0.020 75-90 72-90 45-72 0-45 C <br /> AMW-1C 07/31/00 11.703 120 16/8 2 SCH.40 PVC 0.020 105-120 102-120 45-102 Ods D <br /> AMW-2 042852 12.275 56 10 4 SCN.40 PVC 0.02 36-56 33-56 29-33 0-29 6 installed in B-6 <br /> AMW-3 055552 12.987 56 10 4 SCH.40 PVC 0.02 34.5-54.5 32.5-56 30-32.5 0-30 B installed in B-8 <br /> AMWd 01/1153 - 57 10.25 4 SCH.40 PVC 0.02 36.5-56.5 35-57 32.5-35 0-32.5 B installed in B-14,destroyed 10/3/05 <br /> AMW-5 01/1253 11.903 57 10.25 4 SCH.40 PVC 0.02 3757 3557 32.5.35 0-32.5 B installed in B-16 <br /> AMWS 1056/93 10.696 53 8.25 2 SCH.40 PVC 0.02 30-50 29-53 2529 0-25 B installed in B-20 <br /> AMW-7 1057/93 10.658 50 8.25 2 SCH.40 PVC 0.02 30-50 28-50 25-28 0-25 B installed in B-21 <br /> AMW-8 1 08/0250 12.925 30 8 2 SCH.40 PVC 0.020 1 15-30 13-30 11-13 0-11 A <br /> Stockton Charter Way Commingled Plume Soil Boring and Well Construction Details.xls Page 1 of 7 Stantec <br />